305-574-9932
The operation of landing gear, flaps, flight control surfaces, and brakes is largely accomplished with hydraulic power systems.
Some aircraft manufacturers have equipped their aircraft with a high pressure pneumatic system (3,000 psi) in the past.
combines electrical and mechanical processes and procedures drawn from electrical engineering and mechanical engineering.
Part Number | Description | Type | Delivery | Manufacturer |
---|---|---|---|---|
00-200-1500 | PRESSURE CONTACTOR | OVERHAUL | 14 Days | GOODRICH |
00-200-1500 | PRESSURE CONTACTOR | REPAIR | 5 Days | GOODRICH |
00-200-1500 | PRESSURE CONTACTOR | TEST | 3 Days | GOODRICH |
004207-00000 | PRESSURE INDICATOR | INSPECT | 3 Days | SAFRAN |
0711480-001 | HYDRAULIC SHUTOFF VALVE | OVERHAUL | 14 Days | ARKWIN |
0711480-001 | HYDRAULIC SHUTOFF VALVE | REPAIR | 5 Days | ARKWIN |
0711480-001 | HYDRAULIC SHUTOFF VALVE | TEST | 3 Days | ARKWIN |
0711480-003 | HYDRAULIC SHUTOFF VALVE | OVERHAUL | 14 Days | ARKWIN |
0711480-003 | HYDRAULIC SHUTOFF VALVE | REPAIR | 5 Days | ARKWIN |
0711480-003 | HYDRAULIC SHUTOFF VALVE | TEST | 3 Days | ARKWIN |
0711480-004 | HYDRAULIC SHUTOFF VALVE | OVERHAUL | 14 Days | ARKWIN |
0711480-004 | HYDRAULIC SHUTOFF VALVE | REPAIR | 5 Days | ARKWIN |
0711480-004 | HYDRAULIC SHUTOFF VALVE | TEST | 3 Days | ARKWIN |
085225-04645 | ACCUMULATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
085225-04645 | ACCUMULATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
085225-04645 | ACCUMULATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
085878-04645 | ACCUMULATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
085878-04645 | ACCUMULATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
085878-04645 | ACCUMULATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
088256-04644 | ACCUMULATOR-BRAKE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
088256-04644 | ACCUMULATOR-BRAKE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
088256-04644 | ACCUMULATOR-BRAKE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
097-0179-16 | ELECTRICAL CONTACT (ALUMEL) | INSPECT | 3 Days | SAFRAN |
10-02-22 | POSITION PICK OFF | TEST | 3 Days | LUCAS AIR EQUIPMENT |
10-60551-3 | PRESSURE RELIEF VALVE | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
10-60551-3 | PRESSURE RELIEF VALVE | REPAIR | 5 Days | PNEUDRAULICS INC. |
10-60551-3 | PRESSURE RELIEF VALVE | TEST | 3 Days | PNEUDRAULICS INC. |
10-60552-5 | PRESSURE SWITCH | TEST | 3 Days | CUSTOM CONTROL SENSORS |
10-60552-5 | PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM CONTROL SENSORS |
10-60552-5 | PRESSURE SWITCH | OVERHAUL | 21 Days | CUSTOM CONTROL SENSORS |
10-60581-1 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60581-1 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60581-1 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60581-2 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60581-2 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60581-2 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60581-3 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60581-3 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60581-3 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60581-4 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60581-4 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60581-4 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60581-5 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60581-5 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60581-5 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60710-2 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60710-2 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60710-2 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60710-4 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60710-4 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60710-4 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60710-6 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60710-6 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60710-6 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60710-7 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
10-60710-7 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
10-60710-7 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
10-60810-40 | TRANSDUCER ASSY | INSPECT | 3 Days | KAVLICO |
10-60810-42 | LVDT | INSPECT | 3 Days | KAVLICO |
10-60810-45 | LVDT | INSPECT | 3 Days | KAVLICO |
10-60811-10 | SOLENOID VALVE | OVERHAUL | 14 Days | STERER |
10-60811-10 | SOLENOID VALVE | REPAIR | 5 Days | STERER |
10-60811-10 | SOLENOID VALVE | TEST | 3 Days | STERER |
10-60811-6 | SOLENOID VALVE | OVERHAUL | 14 Days | STERER |
10-60811-6 | SOLENOID VALVE | REPAIR | 5 Days | STERER |
10-60811-6 | SOLENOID VALVE | TEST | 3 Days | STERER |
10-61093-201 | ANTI SKID VALVE | TEST | 3 Days | CRANE |
10-61093-201 | ANTI SKID VALVE | REPAIR | 7 Days | CRANE |
10-61093-201 | ANTI SKID VALVE | OVERHAUL | 21 Days | CRANE |
10-61985-5 | HYDRAULIC AUTOPILOT ACTUATOR A | INSPECT | 3 Days | MOOG |
10-61985-5 | HYDRAULIC AUTOPILOT ACTUATOR A | REPAIR | 7 Days | MOOG |
10-61985-5 | HYDRAULIC AUTOPILOT ACTUATOR A | OVERHAUL | 21 Days | MOOG |
10-62018-1 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-1 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-1 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62018-11 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-11 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-11 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62018-12 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-12 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-12 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62018-5 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-5 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-5 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62018-6 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-6 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-6 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62018-7 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-7 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-7 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62018-8 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
10-62018-8 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
10-62018-8 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
10-62204-11 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-11 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-11 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-12 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-12 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-12 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-13 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-13 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-13 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-14 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-14 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-14 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-15 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-15 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-15 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-16 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-16 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-16 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-17 | ANTISKID VOLUMETRIC FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
10-62204-17 | ANTISKID VOLUMETRIC FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
10-62204-17 | ANTISKID VOLUMETRIC FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
10-62204-24 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-24 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
10-62204-24 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
100006109 | SOLENOID | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
100006123 | SOLENOID | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
100109 | LINEAR LVDT DETECTOR | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
106785B100 | MOTOR DC AIRCRAFT | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
106785B100 | MOTOR DC AIRCRAFT | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
106785B100 | MOTOR DC AIRCRAFT | TEST | 3 Days | ITT AEROSPACE CONTROLS |
106792A102 | ACTUATOR ASSEMBLY | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
106792A102 | ACTUATOR ASSEMBLY | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
106792A102 | ACTUATOR ASSEMBLY | TEST | 3 Days | ITT AEROSPACE CONTROLS |
1106A0000-01 | SOLENOID VALVE | OVERHAUL | 14 Days | LIEBHERR |
1106A0000-01 | SOLENOID VALVE | REPAIR | 5 Days | LIEBHERR |
1106A0000-01 | SOLENOID VALVE | TEST | 3 Days | LIEBHERR |
1111A0000-01 | VALVE SOLENOID | OVERHAUL | 14 Days | LIEBHERR |
1111A0000-01 | VALVE SOLENOID | REPAIR | 5 Days | LIEBHERR |
1111A0000-01 | VALVE SOLENOID | TEST | 3 Days | LIEBHERR |
1122364 | SWITCH TEMP HYDR | INSPECT | 3 Days | BOEING |
114086602 | SHAFT | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114086641 | SHAFT | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114087606 | SHAFT | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114087641 | SHAFT | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114087652 | SHAFT | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114151001 | HIGH PRESSURE RELIEF VALVE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
114151001 | HIGH PRESSURE RELIEF VALVE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
114151001 | HIGH PRESSURE RELIEF VALVE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114151002 | HIGH PRESSURE RELIEF VALVE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
114151002 | HIGH PRESSURE RELIEF VALVE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
114151002 | HIGH PRESSURE RELIEF VALVE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114151003 | PRESSURE RELIEF VALVE HIGH | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
114151003 | PRESSURE RELIEF VALVE HIGH | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
114151003 | PRESSURE RELIEF VALVE HIGH | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114151004 | HIGH PRESSURE RELIEF VALVE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
114151004 | HIGH PRESSURE RELIEF VALVE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
114151004 | HIGH PRESSURE RELIEF VALVE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
114193231 | PISTON ROD | INSPECT | 3 Days | SAFRAN |
114193231 | PISTON ROD | REPAIR | 5 Days | SAFRAN |
114193244 | PISTON ROD | INSPECT | 3 Days | SAFRAN |
114193244 | PISTON ROD | REPAIR | 5 Days | SAFRAN |
11493637 | PIN | OVERHAUL | 14 Days | SAFRAN |
11493637 | PIN | REPAIR | 5 Days | SAFRAN |
11493637 | PIN | TEST | 3 Days | SAFRAN |
1171-074 | LINEAR TRANSDUCER | INSPECT | 3 Days | WOODWARD |
1171-074 | LINEAR TRANSDUCER | REPAIR | 5 Days | WOODWARD |
1171-082 | TRANSDUCER | INSPECT | 3 Days | WOODWARD |
1171-082 | TRANSDUCER | REPAIR | 5 Days | WOODWARD |
1171-20 | LINEAR TRANSDUCER | INSPECT | 3 Days | WOODWARD |
1171-20 | LINEAR TRANSDUCER | REPAIR | 5 Days | WOODWARD |
1173T0614-01 | SWITCH TEMPERATURE | INSPECT | 3 Days | BOEING |
1173T0614-03 | TEMPERATURE SWITCH | INSPECT | 3 Days | BOEING |
1198-17 | RETAINER | INSPECT | 3 Days | |
1198-52 | END CAP ASSY | INSPECT | 3 Days | |
1203P0107-01 | SWITCH PRESSURE | INSPECT | 3 Days | BOEING |
1203P0107-03 | PRESSURE SWITCH | INSPECT | 3 Days | BOEING |
1211260-202 | GLAND | INSPECT | 3 Days | ARKWIN |
1211313-105-3 | HOUSING ASSEMBLY | INSPECT | 3 Days | ARKWIN |
1211313-105-4 | CYLINDER ASSEMBLY | INSPECT | 3 Days | ARKWIN |
1211313-240 | LVDT | INSPECT | 3 Days | ARKWIN |
1211318-205 | LVDT | INSPECT | 3 Days | ARKWIN |
1211318-215 | LVDT ASSEMBLY | INSPECT | 3 Days | ARKWIN |
1211342-222 | LVDT | INSPECT | 3 Days | GE AVIATION |
1211523-239 | PRESSURE SWITCH | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
1225P6-2 | PRESSURE SWITCH | INSPECT | 3 Days | ITT AEROSPACE CONTROLS |
132G53-005 | LVDT | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
1386A1100-01 | RODEND ASSY | INSPECT | 3 Days | LIEBHERR |
1396B0000-01 | 2-WAY VALVE | OVERHAUL | 14 Days | LIEBHERR |
1396B0000-01 | 2-WAY VALVE | REPAIR | 5 Days | LIEBHERR |
1396B0000-01 | 2-WAY VALVE | TEST | 3 Days | LIEBHERR |
148975-1 | MOTOR ACT. ROTARY SELECTOR VA | OVERHAUL | 14 Days | WHITTAKER |
148975-1 | MOTOR ACT. ROTARY SELECTOR VA | REPAIR | 5 Days | WHITTAKER |
148975-1 | MOTOR ACT. ROTARY SELECTOR VA | TEST | 3 Days | WHITTAKER |
148975-2 | VALVE, BYPASS FLOAT CONTROL D | OVERHAUL | 14 Days | WHITTAKER |
148975-2 | VALVE, BYPASS FLOAT CONTROL D | REPAIR | 5 Days | WHITTAKER |
148975-2 | VALVE, BYPASS FLOAT CONTROL D | TEST | 3 Days | WHITTAKER |
150T181-1 | SWITCH | INSPECT | 3 Days | CUSTOM COMPONENT SWITCH |
1529200-1 | YAW DAMPER SERVO | OVERHAUL | 14 Days | NABTESCO |
1529200-1 | YAW DAMPER SERVO | REPAIR | 5 Days | NABTESCO |
1529200-1 | YAW DAMPER SERVO | TEST | 3 Days | NABTESCO |
1536600-1 | YAW DAMPER SERVO ASSEMBLY | OVERHAUL | 14 Days | NABTESCO |
1536600-1 | YAW DAMPER SERVO ASSEMBLY | REPAIR | 5 Days | NABTESCO |
1536600-1 | YAW DAMPER SERVO ASSEMBLY | TEST | 3 Days | NABTESCO |
1536600-3 | YAW DAMPER SERVO ASSEMBLY | OVERHAUL | 14 Days | NABTESCO |
1536600-3 | YAW DAMPER SERVO ASSEMBLY | REPAIR | 5 Days | NABTESCO |
1536600-3 | YAW DAMPER SERVO ASSEMBLY | TEST | 3 Days | NABTESCO |
1536600-5 | YAW DAMPER SERVO ASSEMBLY | OVERHAUL | 14 Days | NABTESCO |
1536600-5 | YAW DAMPER SERVO ASSEMBLY | REPAIR | 5 Days | NABTESCO |
1536600-5 | YAW DAMPER SERVO ASSEMBLY | TEST | 3 Days | NABTESCO |
1536600-7 | YAW DAMPER SERVO ASSEMBLY | OVERHAUL | 14 Days | NABTESCO |
1536600-7 | YAW DAMPER SERVO ASSEMBLY | REPAIR | 5 Days | NABTESCO |
1536600-7 | YAW DAMPER SERVO ASSEMBLY | TEST | 3 Days | NABTESCO |
1540500-1 | YAW DAMPER SERVO | OVERHAUL | 14 Days | NABTESCO |
1540500-1 | YAW DAMPER SERVO | REPAIR | 5 Days | NABTESCO |
1540500-1 | YAW DAMPER SERVO | TEST | 3 Days | NABTESCO |
1540500-11 | YAW DAMPER SERVO ASSY | OVERHAUL | 14 Days | NABTESCO |
1540500-11 | YAW DAMPER SERVO ASSY | REPAIR | 5 Days | NABTESCO |
1540500-11 | YAW DAMPER SERVO ASSY | TEST | 3 Days | NABTESCO |
1540500-13 | YAW DAMPER SERVO | OVERHAUL | 14 Days | NABTESCO |
1540500-13 | YAW DAMPER SERVO | REPAIR | 5 Days | NABTESCO |
1540500-13 | YAW DAMPER SERVO | TEST | 3 Days | NABTESCO |
1540500-15 | YAW DAMPER SERVO ASSY | OVERHAUL | 14 Days | NABTESCO |
1540500-15 | YAW DAMPER SERVO ASSY | REPAIR | 5 Days | NABTESCO |
1540500-15 | YAW DAMPER SERVO ASSY | TEST | 3 Days | NABTESCO |
1540500-3 | YAW DAMPER SERVO ASSY | OVERHAUL | 14 Days | NABTESCO |
1540500-3 | YAW DAMPER SERVO ASSY | REPAIR | 5 Days | NABTESCO |
1540500-3 | YAW DAMPER SERVO ASSY | TEST | 3 Days | NABTESCO |
1540500-5 | YAW DAMPER SERVO | OVERHAUL | 14 Days | NABTESCO |
1540500-5 | YAW DAMPER SERVO | REPAIR | 5 Days | NABTESCO |
1540500-5 | YAW DAMPER SERVO | TEST | 3 Days | NABTESCO |
1540500-7 | YAW DAMPER SERVO ASSY | OVERHAUL | 14 Days | NABTESCO |
1540500-7 | YAW DAMPER SERVO ASSY | REPAIR | 5 Days | NABTESCO |
1540500-7 | YAW DAMPER SERVO ASSY | TEST | 3 Days | NABTESCO |
1540500-9 | YAW DAMPER SERVO | OVERHAUL | 14 Days | NABTESCO |
1540500-9 | YAW DAMPER SERVO | REPAIR | 5 Days | NABTESCO |
1540500-9 | YAW DAMPER SERVO | TEST | 3 Days | NABTESCO |
1540530-1 | LVDT | INSPECT | 3 Days | TEIJIN SEIKI |
1540603 | CYLINDER BARREL | INSPECT | 3 Days | TEIJIN SEIKI |
1540603 | CYLINDER BARREL | REPAIR | 5 Days | TEIJIN SEIKI |
1542600-1 | OUTBOARD SPOILER POWER CONTR | OVERHAUL | 14 Days | NABTESCO |
1542600-1 | OUTBOARD SPOILER POWER CONTR | REPAIR | 5 Days | NABTESCO |
1542600-1 | OUTBOARD SPOILER POWER CONTR | TEST | 3 Days | NABTESCO |
1542600-11 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-11 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-11 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542600-13 | OUTBOARD POWER CONTROL ACTU | OVERHAUL | 14 Days | NABTESCO |
1542600-13 | OUTBOARD POWER CONTROL ACTU | REPAIR | 5 Days | NABTESCO |
1542600-13 | OUTBOARD POWER CONTROL ACTU | TEST | 3 Days | NABTESCO |
1542600-15 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-15 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-15 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542600-17 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-17 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-17 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542600-19 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-19 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-19 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542600-3 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-3 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-3 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542600-5 | OUTBOARD SPOILER POWER CONTR | OVERHAUL | 14 Days | NABTESCO |
1542600-5 | OUTBOARD SPOILER POWER CONTR | REPAIR | 5 Days | NABTESCO |
1542600-5 | OUTBOARD SPOILER POWER CONTR | TEST | 3 Days | NABTESCO |
1542600-7 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-7 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-7 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542600-9 | POWER CONTROL ACTUATOR | OVERHAUL | 14 Days | NABTESCO |
1542600-9 | POWER CONTROL ACTUATOR | REPAIR | 5 Days | NABTESCO |
1542600-9 | POWER CONTROL ACTUATOR | TEST | 3 Days | NABTESCO |
1542630-1 | CYLINDER CAP ASSY | INSPECT | 3 Days | NABTESCO |
1542650-1 | VALVE ASSY EXTENSION | INSPECT | 3 Days | NABTESCO |
1542660-1 | LVDT MATCHED SET | INSPECT | 3 Days | NABTESCO |
1542664-1 | VALVE ASSY EXTENSION | INSPECT | 3 Days | NABTESCO |
1542670-1 | VALVE ASSY EXTENSION | INSPECT | 3 Days | NABTESCO |
154800-3 | MOTOR ARMATURE | INSPECT | 3 Days | WHITTAKER |
157720-1 | ROTARY ACTUATOR | INSPECT | 3 Days | WHITTAKER |
157720-1 | ROTARY ACTUATOR | REPAIR | 5 Days | WHITTAKER |
157720-1 | ROTARY ACTUATOR | OVERHAUL | 14 Days | WHITTAKER |
157720-2 | ROTARY ACTUATOR | TEST | 3 Days | WHITTAKER |
157720-2 | ROTARY ACTUATOR | REPAIR | 5 Days | WHITTAKER |
157720-2 | ROTARY ACTUATOR | OVERHAUL | 14 Days | WHITTAKER |
158300-101 | AUTOPILOT | OVERHAUL | 14 Days | MOOG |
158300-101 | AUTOPILOT | REPAIR | 5 Days | MOOG |
158300-101 | AUTOPILOT | TEST | 3 Days | MOOG |
158300-150 | MANIFOLD ASSY | INSPECT | 3 Days | MOOG |
163112-001 | LEVER, OUTPUT | INSPECT | 3 Days | |
163112-100 | OUTPUT LEVER | INSPECT | 3 Days | MOOG |
1652 | PRESSURE RELIEF CARTRDGE VALV | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
1652 | PRESSURE RELIEF CARTRDGE VALV | REPAIR | 5 Days | PNEUDRAULICS INC. |
1652 | PRESSURE RELIEF CARTRDGE VALV | TEST | 3 Days | PNEUDRAULICS INC. |
1706-1 | HYDRAULIC RELIEF VALVE | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
1706-1 | HYDRAULIC RELIEF VALVE | REPAIR | 5 Days | PNEUDRAULICS INC. |
1706-1 | HYDRAULIC RELIEF VALVE | TEST | 3 Days | PNEUDRAULICS INC. |
1706-2 | VALVE HYDRAULIC RELIEF | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
1706-2 | VALVE HYDRAULIC RELIEF | REPAIR | 5 Days | PNEUDRAULICS INC. |
1706-2 | VALVE HYDRAULIC RELIEF | TEST | 3 Days | PNEUDRAULICS INC. |
176144 | SOLENOID | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
18-2141-2 | PRESSURE TRANSMITTER | OVERHAUL | 14 Days | ALLIED-SIGNAL AEROSPACE |
18-2141-2 | PRESSURE TRANSMITTER | REPAIR | 5 Days | ALLIED-SIGNAL AEROSPACE |
18-2141-2 | PRESSURE TRANSMITTER | TEST | 3 Days | ALLIED-SIGNAL AEROSPACE |
18-2141-3 | TRANSMITTER HYD | OVERHAUL | 14 Days | ALLIED-SIGNAL AEROSPACE |
18-2141-3 | TRANSMITTER HYD | REPAIR | 5 Days | ALLIED-SIGNAL AEROSPACE |
18-2141-3 | TRANSMITTER HYD | TEST | 3 Days | ALLIED-SIGNAL AEROSPACE |
18-2141 | PRESSURE TRANSMITTER | OVERHAUL | 14 Days | ALLIED-SIGNAL AEROSPACE |
18-2141 | PRESSURE TRANSMITTER | REPAIR | 5 Days | ALLIED-SIGNAL AEROSPACE |
18-2141 | PRESSURE TRANSMITTER | TEST | 3 Days | ALLIED-SIGNAL AEROSPACE |
1905A0000-01 | SAFETY VALVE | OVERHAUL | 14 Days | LIEBHERR |
1905A0000-01 | SAFETY VALVE | REPAIR | 5 Days | LIEBHERR |
1905A0000-01 | SAFETY VALVE | TEST | 3 Days | LIEBHERR |
1FA1401230-1 | LOCK ASSEMBLY | INSPECT | 3 Days | |
1FA1401239 | LOCK ASSY | INSPECT | 3 Days | |
1U1150-1 | AUXILIARY RUDDER POWER CONTRO | OVERHAUL | 14 Days | WOODWARD |
1U1150-1 | AUXILIARY RUDDER POWER CONTRO | REPAIR | 5 Days | WOODWARD |
1U1150-1 | AUXILIARY RUDDER POWER CONTRO | TEST | 3 Days | WOODWARD |
1U1150-2 | AUXILIARY RUDDER POWER CONTRO | OVERHAUL | 14 Days | WOODWARD |
1U1150-2 | AUXILIARY RUDDER POWER CONTRO | REPAIR | 5 Days | WOODWARD |
1U1150-2 | AUXILIARY RUDDER POWER CONTRO | TEST | 3 Days | WOODWARD |
1U1150-3 | AUXILIARY RUDDER POWER CONTRO | OVERHAUL | 14 Days | WOODWARD |
1U1150-3 | AUXILIARY RUDDER POWER CONTRO | REPAIR | 5 Days | WOODWARD |
1U1150-3 | AUXILIARY RUDDER POWER CONTRO | TEST | 3 Days | WOODWARD |
1U1150-4 | RUDDER POWER CONTROL UNIT | OVERHAUL | 14 Days | BOEING |
1U1150-4 | RUDDER POWER CONTROL UNIT | REPAIR | 5 Days | BOEING |
1U1150-4 | RUDDER POWER CONTROL UNIT | TEST | 3 Days | BOEING |
1U1150 | AUXILIARY RUDDER POWER CONTRO | OVERHAUL | 14 Days | WOODWARD |
1U1150 | AUXILIARY RUDDER POWER CONTRO | REPAIR | 5 Days | WOODWARD |
1U1150 | AUXILIARY RUDDER POWER CONTRO | TEST | 3 Days | WOODWARD |
2-7464-3 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-3 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-3 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-4 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-4 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-4 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-5 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-5 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-5 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-5B | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-5B | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-5B | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6B | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6B | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6B | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6C | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6C | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-6C | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-7 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-7 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-7 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7464-7A | NLG DOOR ACTUATOR ASSY | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
2-7464-7A | NLG DOOR ACTUATOR ASSY | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
2-7464-7A | NLG DOOR ACTUATOR ASSY | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
2-7680-1 | FUSE ASSEMBLY | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7680-1 | FUSE ASSEMBLY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7680-1 | FUSE ASSEMBLY | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7680-2 | FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7680-2 | FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7680-2 | FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7681-1 | FUSE ASSEMBLY | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7681-1 | FUSE ASSEMBLY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7681-1 | FUSE ASSEMBLY | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7681-2 | FUSE ASSEMBLY | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7681-2 | FUSE ASSEMBLY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7681-2 | FUSE ASSEMBLY | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7865-2 | FUSE ASSEMBLY | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7865-2 | FUSE ASSEMBLY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7897-3 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7897-3 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7897-3 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7898-3 | FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7898-3 | FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7898-3 | FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-7898-4 | QUANTITY MEASURING FUSE ASSY | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-7898-4 | QUANTITY MEASURING FUSE ASSY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-7898-4 | QUANTITY MEASURING FUSE ASSY | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-1 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-1 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-1 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-11 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-11 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-11 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-12 | FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-12 | FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-12 | FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-13 | HYDRAULIC FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-13 | HYDRAULIC FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-13 | HYDRAULIC FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-14 | QUANTITY MEASURING FUSE ASEMB | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-14 | QUANTITY MEASURING FUSE ASEMB | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-14 | QUANTITY MEASURING FUSE ASEMB | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-15 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-15 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-15 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-16 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-16 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-16 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-18 | FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-18 | FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-18 | FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-2 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-2 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-2 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-24 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-24 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-24 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-25 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-25 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-25 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-26 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-26 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-26 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-27 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-27 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-27 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-28 | FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-28 | FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-28 | FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-29 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-29 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-29 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-3 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-3 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-3 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-5 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-5 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-5 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-6 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-6 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8020-6 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
2-8041-1 | MLG HYD FUSE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
2-8041-1 | MLG HYD FUSE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
2-8041-1 | MLG HYD FUSE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
201-611-01 | LINEAR DETECTOR LVDT | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
20101420-001 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
20101420-001 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
20101420-001 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
20101420-002 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
20101420-002 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
20101420-002 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
20101420-003 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
20101420-003 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
20101420-003 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
20101420-004 | AUTOBRAKE VALVE MODULE | OVERHAUL | 14 Days | WOODWARD |
20101420-004 | AUTOBRAKE VALVE MODULE | REPAIR | 5 Days | WOODWARD |
20101420-004 | AUTOBRAKE VALVE MODULE | TEST | 3 Days | WOODWARD |
20101420-005 | AUTOBRAKE VALVE MODULE | OVERHAUL | 14 Days | WOODWARD |
20101420-005 | AUTOBRAKE VALVE MODULE | REPAIR | 5 Days | WOODWARD |
20101420-005 | AUTOBRAKE VALVE MODULE | TEST | 3 Days | WOODWARD |
20101420-006 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
20101420-006 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
20101420-006 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
20101420-007 | AUTOBRAKE VALVE MODULE | OVERHAUL | 14 Days | WOODWARD |
20101420-007 | AUTOBRAKE VALVE MODULE | REPAIR | 5 Days | WOODWARD |
20101420-007 | AUTOBRAKE VALVE MODULE | TEST | 3 Days | WOODWARD |
20101420 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
20101420 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
20101420 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
20101460-004 | SERVOVALVE ASSY | OVERHAUL | 14 Days | |
20101460-004 | SERVOVALVE ASSY | REPAIR | 5 Days | |
20101460-004 | SERVOVALVE ASSY | TEST | 3 Days | |
20101460-005 | SERVOVALVE ASSY | OVERHAUL | 14 Days | |
20101460-005 | SERVOVALVE ASSY | REPAIR | 5 Days | |
20101460-005 | SERVOVALVE ASSY | TEST | 3 Days | |
20101460-006 | SERVOVALVE ASSY | OVERHAUL | 14 Days | WOODWARD |
20101460-006 | SERVOVALVE ASSY | REPAIR | 5 Days | WOODWARD |
20101460-006 | SERVOVALVE ASSY | TEST | 3 Days | WOODWARD |
20101460-007 | SERVOVALVE ASSEMBLY | OVERHAUL | 14 Days | WOODWARD |
20101460-007 | SERVOVALVE ASSEMBLY | REPAIR | 5 Days | WOODWARD |
20101460-007 | SERVOVALVE ASSEMBLY | TEST | 3 Days | WOODWARD |
20101460-008 | SERVOVALVE ASSEMBLY | OVERHAUL | 14 Days | WOODWARD |
20101460-008 | SERVOVALVE ASSEMBLY | REPAIR | 5 Days | WOODWARD |
20101460-008 | SERVOVALVE ASSEMBLY | TEST | 3 Days | WOODWARD |
20101460-009 | SEVOVALVE ASSEMBLY | OVERHAUL | 14 Days | WOODWARD |
20101460-009 | SEVOVALVE ASSEMBLY | REPAIR | 5 Days | WOODWARD |
20101460-009 | SEVOVALVE ASSEMBLY | TEST | 3 Days | WOODWARD |
20101460-010 | SERVOVALVE ASSY | OVERHAUL | 14 Days | WOODWARD |
20101460-010 | SERVOVALVE ASSY | REPAIR | 5 Days | WOODWARD |
20101460-010 | SERVOVALVE ASSY | TEST | 3 Days | WOODWARD |
201590205 | ROD SUBASSEMBLY PISTON | INSPECT | 3 Days | SAFRAN |
201590205 | ROD SUBASSEMBLY PISTON | REPAIR | 5 Days | SAFRAN |
201590900 | PIN | OVERHAUL | 14 Days | |
201590900 | PIN | REPAIR | 5 Days | |
201590900 | PIN | TEST | 3 Days | |
2022522-1 | ROTARY ELECTROMECHANICAL ACT | OVERHAUL | 14 Days | HONEYWELL |
2022522-1 | ROTARY ELECTROMECHANICAL ACT | REPAIR | 5 Days | HONEYWELL |
2022522-1 | ROTARY ELECTROMECHANICAL ACT | TEST | 3 Days | HONEYWELL |
2022522-2 | ROTARY ELECTROMECHANICAL ACT | OVERHAUL | 14 Days | HONEYWELL |
2022522-2 | ROTARY ELECTROMECHANICAL ACT | REPAIR | 5 Days | HONEYWELL |
2022522-2 | ROTARY ELECTROMECHANICAL ACT | TEST | 3 Days | HONEYWELL |
2022522-3 | ROTARY ELECTROMEHANICAL ACTU | OVERHAUL | 14 Days | HONEYWELL |
2022522-3 | ROTARY ELECTROMEHANICAL ACTU | REPAIR | 5 Days | HONEYWELL |
2022522-3 | ROTARY ELECTROMEHANICAL ACTU | TEST | 3 Days | HONEYWELL |
2022522-4 | ROTARY ELECTROMECHANICAL ACT | OVERHAUL | 14 Days | HONEYWELL |
2022522-4 | ROTARY ELECTROMECHANICAL ACT | REPAIR | 5 Days | HONEYWELL |
2022522-4 | ROTARY ELECTROMECHANICAL ACT | TEST | 3 Days | HONEYWELL |
2022522-5 | ACTUATOR ROTARY ELECTRO | OVERHAUL | 14 Days | HONEYWELL |
2022522-5 | ACTUATOR ROTARY ELECTRO | REPAIR | 5 Days | HONEYWELL |
2022522-5 | ACTUATOR ROTARY ELECTRO | TEST | 3 Days | HONEYWELL |
202551-3 | MANIFOLD SUBASSEMBLY | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
202551-3 | MANIFOLD SUBASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
205300-5005 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
205300-5005 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
205300-5005 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
211C223-175 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-175 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-176 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-176 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-177 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-177 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-178 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-178 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-199 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-200 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-203 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-208 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-209 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-211 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-212 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-214 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-216 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-252 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-253 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-275 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-278 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-278 | HYDRAULIC PRESSURE SWITCH | TEST | 3 Days | EATON |
211C223-296 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-297 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-301 | HYDRAULIC PRESSURE SWITCH | TEST | 3 Days | EATON |
211C223-301 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-312 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-319 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-319 | HYDRAULIC PRESSURE SWITCH | TEST | 3 Days | EATON |
211C223-320 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-321 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-322 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-323 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-324 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-326 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-326 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-327 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-327 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-516 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-516 | HYDRAULIC PRESSURE SWITCH | TEST | 3 Days | EATON |
211C223-517 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-518 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-518 | HYDRAULIC PRESSURE SWITCH | TEST | 3 Days | EATON |
211C223-519 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-520 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-521 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-522 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-523 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-524 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-525 | PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-525 | PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-526 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-527 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-528 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-528 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-534 | PRESSURE SWITCH | TEST | 3 Days | EATON |
211C223-534 | PRESSURE SWITCH | REPAIR | 5 Days | EATON |
211C223-659 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
211C223-659 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
2189032-1 | END HOUSING ASSEMBLY | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
2189032-9 | END HOUSING ASSEMBLY | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
2189035-1 | HOUSING ASSEMBLY LOCKING END | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
2189035-5 | HOUSING ASSEMBLY LOCKING END | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
2189047-1 | GEAR AND WORM ASSEMBLY | INSPECT | 3 Days | |
2189047-2 | GEAR AND WORM ASSEMBLY | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
2189116-5 | END HOUSING ASSEMBLY | INSPECT | 3 Days | |
21C1-6-7 | DIFFERENTIAL PRESSURE SWITCH | INSPECT | 3 Days | EATON |
21SN04-275A | SWITCH, PRESSURE | OVERHAUL | 14 Days | EATON |
21SN04-275A | SWITCH, PRESSURE | REPAIR | 5 Days | EATON |
21SN04-275A | SWITCH, PRESSURE | TEST | 3 Days | EATON |
21SN41-42 | PRESSURE SWITCH | OVERHAUL | 14 Days | EATON |
21SN41-42 | PRESSURE SWITCH | REPAIR | 5 Days | EATON |
21SN41-42 | PRESSURE SWITCH | TEST | 3 Days | EATON |
21SN41-52 | SWITCH | OVERHAUL | 14 Days | EATON |
21SN41-52 | SWITCH | REPAIR | 5 Days | EATON |
21SN41-52 | SWITCH | TEST | 3 Days | EATON |
21SN41-84 | PRESSURE SWITCH | OVERHAUL | 14 Days | EATON |
21SN41-84 | PRESSURE SWITCH | REPAIR | 5 Days | EATON |
21SN41-84 | PRESSURE SWITCH | TEST | 3 Days | EATON |
2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
240705-1 | MOTOR ACT. ROTARY SELECTOR VA | OVERHAUL | 14 Days | WHITTAKER |
240705-1 | MOTOR ACT. ROTARY SELECTOR VA | REPAIR | 5 Days | WHITTAKER |
240705-1 | MOTOR ACT. ROTARY SELECTOR VA | TEST | 3 Days | WHITTAKER |
240705-2 | MOTOR ACT. ROTARY SELECTOR VA | OVERHAUL | 14 Days | WHITTAKER |
240705-2 | MOTOR ACT. ROTARY SELECTOR VA | REPAIR | 5 Days | WHITTAKER |
240705-2 | MOTOR ACT. ROTARY SELECTOR VA | TEST | 3 Days | WHITTAKER |
240705 | BYPASS VALVE | OVERHAUL | 14 Days | WHITTAKER |
240705 | BYPASS VALVE | REPAIR | 5 Days | WHITTAKER |
240705 | BYPASS VALVE | TEST | 3 Days | WHITTAKER |
25-003-2-5 | BODY ASSEMBLY | INSPECT | 3 Days | SAFRAN |
251A1240-3 | SPOILER CONTROL UNIT | OVERHAUL | 14 Days | BOEING |
251A1240-3 | SPOILER CONTROL UNIT | REPAIR | 5 Days | BOEING |
251A1240-3 | SPOILER CONTROL UNIT | TEST | 3 Days | BOEING |
251A1240-5 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
251A1240-5 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
251A1240-5 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
251A1240-6 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
251A1240-6 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
251A1240-6 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
251A1244-1 | CAP | INSPECT | 3 Days | BOEING |
251A1250-1 | CHECK VALVE ASSEMBLY | INSPECT | 3 Days | BOEING |
251A1270-4 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
251A1270-4 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
251A1270-4 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
251A1270-5 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
251A1270-5 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
251A1270-5 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
251A1270-6 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
251A1270-6 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
251A1270-6 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
251A2160-2 | AILERON/ELEVATOR POWER CONTR | OVERHAUL | 14 Days | BOEING |
251A2160-2 | AILERON/ELEVATOR POWER CONTR | REPAIR | 5 Days | BOEING |
251A2160-2 | AILERON/ELEVATOR POWER CONTR | TEST | 3 Days | BOEING |
251N2089-1 | ROD ASSY | OVERHAUL | 14 Days | BOEING |
251N2089-1 | ROD ASSY | REPAIR | 5 Days | BOEING |
251N2089-1 | ROD ASSY | TEST | 3 Days | BOEING |
252T1301-1 | INBOARD SPOILER PCU | OVERHAUL | 14 Days | BOEING |
252T1301-1 | INBOARD SPOILER PCU | REPAIR | 5 Days | BOEING |
252T1301-1 | INBOARD SPOILER PCU | TEST | 3 Days | BOEING |
252T1301-2 | INBOARD SPOILER PCA | OVERHAUL | 14 Days | BOEING |
252T1301-2 | INBOARD SPOILER PCA | REPAIR | 5 Days | BOEING |
252T1301-2 | INBOARD SPOILER PCA | TEST | 3 Days | BOEING |
252T1301-3 | INBOARD SPOILER PCA ASSY | OVERHAUL | 14 Days | BOEING |
252T1301-3 | INBOARD SPOILER PCA ASSY | REPAIR | 5 Days | BOEING |
252T1301-3 | INBOARD SPOILER PCA ASSY | TEST | 3 Days | BOEING |
252T1401-1 | OUTBOARD SPOILER PCA | OVERHAUL | 14 Days | BOEING |
252T1401-1 | OUTBOARD SPOILER PCA | REPAIR | 5 Days | BOEING |
252T1401-1 | OUTBOARD SPOILER PCA | TEST | 3 Days | BOEING |
252T1401-2 | OUTBOARD SPOILER PCA | OVERHAUL | 14 Days | BOEING |
252T1401-2 | OUTBOARD SPOILER PCA | REPAIR | 5 Days | BOEING |
252T1401-2 | OUTBOARD SPOILER PCA | TEST | 3 Days | BOEING |
252T1401-3 | OUTBOARD SPOILER PCA ASSY | OVERHAUL | 14 Days | BOEING |
252T1401-3 | OUTBOARD SPOILER PCA ASSY | REPAIR | 5 Days | BOEING |
252T1401-3 | OUTBOARD SPOILER PCA ASSY | TEST | 3 Days | BOEING |
252T1407-2 | PISTON | INSPECT | 3 Days | BOEING |
252T1407-3 | PISTON | INSPECT | 3 Days | BOEING |
254A1240-1 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-1 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-1 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-10 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-10 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-10 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-11 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-11 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-11 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-12 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-12 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-12 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-13 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-13 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-13 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-14 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-14 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-14 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-2 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-2 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-2 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-3 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-3 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-3 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-4 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-4 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-4 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-7 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-7 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-7 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-8 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-8 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-8 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1240-9 | CONTROL STAND THRUST LEVER AS | OVERHAUL | 14 Days | BOEING |
254A1240-9 | CONTROL STAND THRUST LEVER AS | REPAIR | 5 Days | BOEING |
254A1240-9 | CONTROL STAND THRUST LEVER AS | TEST | 3 Days | BOEING |
254A1290-1 | ENGINE START BRAKE ASSEMBLY | OVERHAUL | 14 Days | BOEING |
254A1290-1 | ENGINE START BRAKE ASSEMBLY | REPAIR | 5 Days | BOEING |
254A1290-1 | ENGINE START BRAKE ASSEMBLY | TEST | 3 Days | BOEING |
254A1290-2 | ENGINE START BRAKE ASSEMBLY | OVERHAUL | 14 Days | BOEING |
254A1290-2 | ENGINE START BRAKE ASSEMBLY | REPAIR | 5 Days | BOEING |
254A1290-2 | ENGINE START BRAKE ASSEMBLY | TEST | 3 Days | BOEING |
254A1290-4 | ENGINE START BRAKE ASSEMBLY | OVERHAUL | 14 Days | BOEING |
254A1290-4 | ENGINE START BRAKE ASSEMBLY | REPAIR | 5 Days | BOEING |
254A1290-4 | ENGINE START BRAKE ASSEMBLY | TEST | 3 Days | BOEING |
254A1290-5 | BRAKE ASSY | OVERHAUL | 14 Days | BOEING |
254A1290-5 | BRAKE ASSY | REPAIR | 5 Days | BOEING |
254A1290-5 | BRAKE ASSY | TEST | 3 Days | BOEING |
254A1290-6 | BRAKE ASSY | OVERHAUL | 14 Days | BOEING |
254A1290-6 | BRAKE ASSY | REPAIR | 5 Days | BOEING |
254A1290-6 | BRAKE ASSY | TEST | 3 Days | BOEING |
27002-1 | LVDT | INSPECT | 3 Days | GOODRICH |
27002-3 | LVDT | INSPECT | 3 Days | GOODRICH |
27003-1 | SOLENOID VALVE | INSPECT | 3 Days | GOODRICH |
27003-5 | SOLENOID VALVE | INSPECT | 3 Days | GOODRICH |
271N501-2 | SHUTOFF VALVE | OVERHAUL | 14 Days | WHITTAKER |
271N501-2 | SHUTOFF VALVE | REPAIR | 5 Days | WHITTAKER |
271N501-2 | SHUTOFF VALVE | TEST | 3 Days | WHITTAKER |
273N2052-1 | HEADEND ASSY | INSPECT | 3 Days | BOEING |
273N2052-1 | HEADEND ASSY | REPAIR | 5 Days | BOEING |
273N2053-1 | CAP ASSY-END | INSPECT | 3 Days | BOEING |
273N2053-1 | CAP ASSY-END | REPAIR | 5 Days | BOEING |
273N4034-3 | MLG DOOR ACTUATOR | OVERHAUL | 14 Days | BOEING |
273N4034-3 | MLG DOOR ACTUATOR | REPAIR | 5 Days | BOEING |
273N4034-3 | MLG DOOR ACTUATOR | TEST | 3 Days | BOEING |
273N4041-22 | MLG DOOR ACTUATOR | OVERHAUL | 14 Days | BOEING |
273N4041-22 | MLG DOOR ACTUATOR | REPAIR | 5 Days | BOEING |
273N4041-22 | MLG DOOR ACTUATOR | TEST | 3 Days | BOEING |
273N4041-6 | MLG DOOR ACTUATOR | OVERHAUL | 14 Days | BOEING |
273N4041-6 | MLG DOOR ACTUATOR | REPAIR | 5 Days | BOEING |
273N4041-6 | MLG DOOR ACTUATOR | TEST | 3 Days | BOEING |
273N4171-1 | MLG DOOR ACTUATOR | OVERHAUL | 14 Days | BOEING |
273N4171-1 | MLG DOOR ACTUATOR | REPAIR | 5 Days | BOEING |
273N4171-1 | MLG DOOR ACTUATOR | TEST | 3 Days | BOEING |
273N4171-3 | MLG DOOR ACTUATOR | OVERHAUL | 14 Days | BOEING |
273N4171-3 | MLG DOOR ACTUATOR | REPAIR | 5 Days | BOEING |
273N4171-3 | MLG DOOR ACTUATOR | TEST | 3 Days | BOEING |
273N4171-4 | MLG DOOR ACTUATOR | OVERHAUL | 14 Days | BOEING |
273N4171-4 | MLG DOOR ACTUATOR | REPAIR | 5 Days | BOEING |
273N4171-4 | MLG DOOR ACTUATOR | TEST | 3 Days | BOEING |
273T6105-2 | ROD END | INSPECT | 3 Days | BOEING |
273T6105-3 | ROD END | INSPECT | 3 Days | BOEING |
273T6105-4 | ROD END | INSPECT | 3 Days | BOEING |
273T6105-5 | ROD END | INSPECT | 3 Days | BOEING |
275N1238-1 | TRUNNION | INSPECT | 3 Days | BOEING |
275N1238-2 | TRUNNION | INSPECT | 3 Days | BOEING |
275T6223-1 | TRUNNION | OVERHAUL | 14 Days | BOEING |
275T6223-1 | TRUNNION | REPAIR | 5 Days | BOEING |
275T6223-1 | TRUNNION | TEST | 3 Days | BOEING |
275T6223-4 | TRUNNION | OVERHAUL | 14 Days | BOEING |
275T6223-4 | TRUNNION | REPAIR | 5 Days | BOEING |
275T6223-4 | TRUNNION | TEST | 3 Days | BOEING |
276A2001-1 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
276A2001-1 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
276A2001-1 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
276A2001-2 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
276A2001-2 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
276A2001-2 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
276A2001-3 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
276A2001-3 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
276A2001-3 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
276A2003-1 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-1 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-1 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
276A2003-2 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-2 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-2 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
276A2003-201 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-201 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-201 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
276A2003-3 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-3 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-3 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
276A2003-4 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-4 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-4 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
276A2003-5 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-5 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-5 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
276A2003-6 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
276A2003-6 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
276A2003-6 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
2790523-101 | VALVE CARTRIDGE CHK | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
2790523-101 | VALVE CARTRIDGE CHK | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
2790523-101 | VALVE CARTRIDGE CHK | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
2790523-102 | CARTRDGE CHECK VALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
2790523-102 | CARTRDGE CHECK VALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
2790523-102 | CARTRDGE CHECK VALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
28008318-102 | TORQUE MOTOR AND FEEDBACK WIR | INSPECT | 3 Days | WOODWARD |
282700-1005 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282700-1005 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282700-1005 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282700-1007 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282700-1007 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282700-1007 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282700-1009 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282700-1009 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282700-1009 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282700-1011 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282700-1011 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282700-1011 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282800-1003 | INBOARD AILERON PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282800-1003 | INBOARD AILERON PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282800-1003 | INBOARD AILERON PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282800-1005 | ACTUATOR, PWR CONT | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282800-1005 | ACTUATOR, PWR CONT | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282800-1005 | ACTUATOR, PWR CONT | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282800-1007 | PCU ACTUATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282800-1007 | PCU ACTUATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282800-1007 | PCU ACTUATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282800-1009 | ACTUATOR, INBD AIL PWR CONT | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282800-1009 | ACTUATOR, INBD AIL PWR CONT | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282800-1009 | ACTUATOR, INBD AIL PWR CONT | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282800-1011 | INBOARD AILERON PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282800-1011 | INBOARD AILERON PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282800-1011 | INBOARD AILERON PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1003 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282900-1003 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1003 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282900-1005 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282900-1005 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1005 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282900-1007 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282900-1007 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1007 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282900-1009 | PCU ELEVATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282900-1009 | PCU ELEVATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1009 | PCU ELEVATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282900-1011 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282900-1011 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1011 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
282900-1013 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
282900-1013 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
282900-1013 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
283200-1005 | OUTBOARD AILERON PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
283200-1005 | OUTBOARD AILERON PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
283200-1005 | OUTBOARD AILERON PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
283200-1007 | OUTBOARD AILERON PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
283200-1007 | OUTBOARD AILERON PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
283200-1007 | OUTBOARD AILERON PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
283200-1009 | OUTBOARD AILERON PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
283200-1009 | OUTBOARD AILERON PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
283200-1009 | OUTBOARD AILERON PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
283210-101 | LAP ASSY TRANSFER | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
283243-1 | ROD END ASSY | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
283243-3 | ROD END ASSY | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
2LA005303-01 | STROBE LIGHT UNIT TA | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
2LA005303-01 | STROBE LIGHT UNIT TA | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
2LA005303-01 | STROBE LIGHT UNIT TA | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
2LA005303-05 | TAIL STROBE LIGHT | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
2LA005303-05 | TAIL STROBE LIGHT | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
2LA005303-05 | TAIL STROBE LIGHT | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
2LA456342-01 | LED LOGO LIGHT | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
2LA456342-01 | LED LOGO LIGHT | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
2LA456342-01 | LED LOGO LIGHT | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
2LA456342-02 | LED LOGO | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
2LA456342-02 | LED LOGO | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
2LA456342-02 | LED LOGO | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
2LA456342-03 | LED LOGO LIGHT | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
2LA456342-03 | LED LOGO LIGHT | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
2LA456342-03 | LED LOGO LIGHT | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
2LA456342-04 | LED LOGO LIGHT | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
2LA456342-04 | LED LOGO LIGHT | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
2LA456342-04 | LED LOGO LIGHT | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
30-2506-3 | LIGHT | OVERHAUL | 14 Days | HONEYWELL |
30-2506-3 | LIGHT | REPAIR | 5 Days | HONEYWELL |
30-2506-3 | LIGHT | TEST | 3 Days | HONEYWELL |
30973-222 | ELECTROVALVE | OVERHAUL | 14 Days | GOODRICH |
30973-222 | ELECTROVALVE | REPAIR | 5 Days | GOODRICH |
30973-222 | ELECTROVALVE | TEST | 3 Days | GOODRICH |
30973-242 | ELECTROVALVE | OVERHAUL | 14 Days | GOODRICH |
30973-242 | ELECTROVALVE | REPAIR | 5 Days | GOODRICH |
30973-242 | ELECTROVALVE | TEST | 3 Days | GOODRICH |
30973-262 | ELECTROVALVE | OVERHAUL | 14 Days | GOODRICH |
30973-262 | ELECTROVALVE | REPAIR | 5 Days | GOODRICH |
30973-262 | ELECTROVALVE | TEST | 3 Days | GOODRICH |
30983-222 | ELECTROVALVE | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
30983-222 | ELECTROVALVE | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
30983-222 | ELECTROVALVE | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
30983-242 | ELECTROVALVE | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
30983-242 | ELECTROVALVE | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
30983-242 | ELECTROVALVE | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
30983-262 | ELECTROVALVE | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
30983-262 | ELECTROVALVE | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
30983-262 | ELECTROVALVE | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31076-080 | SPOILER SERVO CONTROL | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31076-080 | SPOILER SERVO CONTROL | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31076-080 | SPOILER SERVO CONTROL | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31076-110 | OUTBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31076-110 | OUTBOARD SPOILER ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31076-110 | OUTBOARD SPOILER ACTUATOR | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31077-050 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31077-050 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31077-050 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31077-060 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31077-060 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31077-060 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31077-070 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31077-070 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31077-070 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31077-100 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | COLLINS AEROSPACE |
31077-100 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | COLLINS AEROSPACE |
31077-100 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | COLLINS AEROSPACE |
31077-110 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31077-110 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31077-110 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31077-111 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | COLLINS AEROSPACE |
31077-111 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | COLLINS AEROSPACE |
31077-111 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | COLLINS AEROSPACE |
31077-112 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | UTC AEROSPACE SYSTEMS |
31077-112 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
31077-112 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | UTC AEROSPACE SYSTEMS |
31077-200 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | COLLINS AEROSPACE |
31077-200 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | COLLINS AEROSPACE |
31077-200 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | COLLINS AEROSPACE |
31077-211 | INBOARD SPOILER ACTUATOR | OVERHAUL | 14 Days | COLLINS AEROSPACE |
31077-211 | INBOARD SPOILER ACTUATOR | REPAIR | 5 Days | COLLINS AEROSPACE |
31077-211 | INBOARD SPOILER ACTUATOR | TEST | 3 Days | COLLINS AEROSPACE |
311257 | PISTON | INSPECT | 3 Days | CRANE |
3163271-1 | TRANSMITTER | INSPECT | 3 Days | HONEYWELL |
316525 | PUMP ASSY-HAND | OVERHAUL | 14 Days | CRANE |
316525 | PUMP ASSY-HAND | REPAIR | 5 Days | CRANE |
316525 | PUMP ASSY-HAND | TEST | 3 Days | CRANE |
3169859-1 | RESISTOR ASSY LINEAR | INSPECT | 3 Days | HONEYWELL |
3170212-2 | COVER SWITCH | INSPECT | 3 Days | HONEYWELL |
3170212-3 | COVER SWITCH | INSPECT | 3 Days | HONEYWELL |
3170417-1 | TEMPERATURE SENSOR | INSPECT | 3 Days | HONEYWELL |
317100-1001 | PRESSURE DIFFERENTIAL SENSOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
317100-1001 | PRESSURE DIFFERENTIAL SENSOR | REPAIR | 7 Days | PARKER HANNIFIN AEROSPACE |
317100-1001 | PRESSURE DIFFERENTIAL SENSOR | OVERHAUL | 21 Days | PARKER HANNIFIN AEROSPACE |
317100-1003 | PRESSURE DIFFERENTIAL SENSOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
317100-1003 | PRESSURE DIFFERENTIAL SENSOR | REPAIR | 7 Days | PARKER HANNIFIN AEROSPACE |
317100-1003 | PRESSURE DIFFERENTIAL SENSOR | OVERHAUL | 21 Days | PARKER HANNIFIN AEROSPACE |
317100-1005 | PRESSURE DIFFERENTIAL SENSOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
317100-1005 | PRESSURE DIFFERENTIAL SENSOR | REPAIR | 7 Days | PARKER HANNIFIN AEROSPACE |
317100-1005 | PRESSURE DIFFERENTIAL SENSOR | OVERHAUL | 21 Days | PARKER HANNIFIN AEROSPACE |
317100-1007 | PRESSURE DIFFERENTIAL SENSOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
317100-1007 | PRESSURE DIFFERENTIAL SENSOR | REPAIR | 7 Days | PARKER HANNIFIN AEROSPACE |
317100-1007 | PRESSURE DIFFERENTIAL SENSOR | OVERHAUL | 21 Days | PARKER HANNIFIN AEROSPACE |
3171784-3 | SENSOR | INSPECT | 3 Days | HONEYWELL |
3171784-7 | TEMPERATURE SENSOR | INSPECT | 3 Days | HONEYWELL |
3175955-2 | RESISTOR ASSY. | INSPECT | 3 Days | HONEYWELL |
3175955-4 | RESISTOR ASSY | INSPECT | 3 Days | HONEYWELL |
3175956-2 | RESISTOR POTENTIOMETER | INSPECT | 3 Days | HONEYWELL |
3175956-4 | RESISTOR POTENTIOMETER | INSPECT | 3 Days | HONEYWELL |
3180200B | PUMP ASSY | OVERHAUL | 14 Days | BENDIX ELECTRODYNAMICS DIVI |
3180200B | PUMP ASSY | REPAIR | 5 Days | BENDIX ELECTRODYNAMICS DIVI |
3180200B | PUMP ASSY | TEST | 3 Days | BENDIX ELECTRODYNAMICS DIVI |
31806-4 | COIL ASSY. | INSPECT | 3 Days | EATON |
31806-9 | COIL ASSY | INSPECT | 3 Days | EATON |
31806 | COIL ASSY | INSPECT | 3 Days | EATON |
320291-3 | SOLENOID VALVE ASSY | OVERHAUL | 14 Days | HONEYWELL |
320291-3 | SOLENOID VALVE ASSY | REPAIR | 5 Days | HONEYWELL |
320291-3 | SOLENOID VALVE ASSY | TEST | 3 Days | HONEYWELL |
320800-1 | VALVE ASSY- SOLENOID | OVERHAUL | 14 Days | HONEYWELL |
320800-1 | VALVE ASSY- SOLENOID | REPAIR | 5 Days | HONEYWELL |
320800-1 | VALVE ASSY- SOLENOID | TEST | 3 Days | HONEYWELL |
320800-4 | SOLENOID VALVE ASSY | OVERHAUL | 14 Days | HONEYWELL |
320800-4 | SOLENOID VALVE ASSY | REPAIR | 5 Days | HONEYWELL |
320800-4 | SOLENOID VALVE ASSY | TEST | 3 Days | HONEYWELL |
321-400-703-0 | DOOR OPENING HYD ACTUATOR | TEST | 3 Days | GOODRICH |
321-400-703-0 | DOOR OPENING HYD ACTUATOR | REPAIR | 7 Days | GOODRICH |
321-400-703-0 | DOOR OPENING HYD ACTUATOR | OVERHAUL | 21 Days | GOODRICH |
321-400-704-0 | DOOR OPENING HYD ACTUATOR | TEST | 3 Days | GOODRICH |
321-400-704-0 | DOOR OPENING HYD ACTUATOR | REPAIR | 7 Days | GOODRICH |
321-400-704-0 | DOOR OPENING HYD ACTUATOR | OVERHAUL | 21 Days | GOODRICH |
321-400-705-0 | DOOR OPENING HYD ACTUATOR | TEST | 3 Days | GOODRICH |
321-400-705-0 | DOOR OPENING HYD ACTUATOR | REPAIR | 7 Days | GOODRICH |
321-400-705-0 | DOOR OPENING HYD ACTUATOR | OVERHAUL | 21 Days | GOODRICH |
321-400-707-0 | DOOR OPENING HYD ACTUATOR | TEST | 3 Days | GOODRICH |
321-400-707-0 | DOOR OPENING HYD ACTUATOR | REPAIR | 7 Days | GOODRICH |
321-400-707-0 | DOOR OPENING HYD ACTUATOR | OVERHAUL | 21 Days | GOODRICH |
33-065-1 | NORMAL ANTI SKID VALVE MODULE | OVERHAUL | 14 Days | CRANE |
33-065-1 | NORMAL ANTI SKID VALVE MODULE | REPAIR | 5 Days | CRANE |
33-065-1 | NORMAL ANTI SKID VALVE MODULE | TEST | 3 Days | CRANE |
33-065-2 | NORMAL ANTI SKID VALVE MODULE | OVERHAUL | 14 Days | CRANE |
33-065-2 | NORMAL ANTI SKID VALVE MODULE | REPAIR | 5 Days | CRANE |
33-065-2 | NORMAL ANTI SKID VALVE MODULE | TEST | 3 Days | CRANE |
33-067-1 | ANTI-SKID MODULE | OVERHAUL | 14 Days | CRANE |
33-067-1 | ANTI-SKID MODULE | REPAIR | 5 Days | CRANE |
33-067-1 | ANTI-SKID MODULE | TEST | 3 Days | CRANE |
33-067-2 | ALTERNATE ANTISKID VALVE MODUL | OVERHAUL | 14 Days | CRANE |
33-067-2 | ALTERNATE ANTISKID VALVE MODUL | REPAIR | 5 Days | CRANE |
33-067-2 | ALTERNATE ANTISKID VALVE MODUL | TEST | 3 Days | CRANE |
33-109-1 | ANTISKID VALVE MODULE ASSEMBLY | OVERHAUL | 14 Days | CRANE |
33-109-1 | ANTISKID VALVE MODULE ASSEMBLY | REPAIR | 5 Days | CRANE |
33-109-1 | ANTISKID VALVE MODULE ASSEMBLY | TEST | 3 Days | CRANE |
33-111-1 | ANTISKID VALVE MODULE ASSEMBLY | OVERHAUL | 14 Days | CRANE |
33-111-1 | ANTISKID VALVE MODULE ASSEMBLY | REPAIR | 5 Days | CRANE |
33-111-1 | ANTISKID VALVE MODULE ASSEMBLY | TEST | 3 Days | CRANE |
3321660 | SLIDE AND SLEEVE | INSPECT | 3 Days | MOOG |
3338042 | LVDT | INSPECT | 3 Days | MOOG |
3338043-2 | SOLENOID VALVE ASSY. | INSPECT | 3 Days | GOODRICH |
3338046 | MODE SELECTOR VALVE | INSPECT | 3 Days | MOOG |
340565 | 2-WAY SHUTOFF VALVE | OVERHAUL | 14 Days | WHITTAKER |
340565 | 2-WAY SHUTOFF VALVE | REPAIR | 5 Days | WHITTAKER |
340565 | 2-WAY SHUTOFF VALVE | TEST | 3 Days | WHITTAKER |
341017 | EYE END | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341017 | EYE END | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341018-050 | ACTUATOR BODY | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341018-050 | ACTUATOR BODY | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341018 | BODY ACTUATOR | INSPECT | 3 Days | GOODRICH |
341018 | BODY ACTUATOR | REPAIR | 5 Days | GOODRICH |
341036-100 | EYE END | INSPECT | 3 Days | GOODRICH |
341036-100 | EYE END | REPAIR | 5 Days | GOODRICH |
341036 | EYE END | INSPECT | 3 Days | GOODRICH |
341036 | EYE END | REPAIR | 5 Days | GOODRICH |
341046-100 | BODY ACTUATOR | INSPECT | 3 Days | |
341046-100 | BODY ACTUATOR | REPAIR | 5 Days | |
341046-110 | BODY ACTUATOR | INSPECT | 3 Days | GOODRICH |
341046-110 | BODY ACTUATOR | REPAIR | 5 Days | GOODRICH |
341046 | BODY ACTUATOR | INSPECT | 3 Days | GOODRICH |
341046 | BODY ACTUATOR | REPAIR | 5 Days | GOODRICH |
341081-100 | BELL CRANK | INSPECT | 3 Days | GOODRICH |
341081-101 | BELL CRANK | INSPECT | 3 Days | GOODRICH |
341081 | BELL CRANK | INSPECT | 3 Days | GOODRICH |
341084-050 | ACTUATOR BODY EQUIPPED | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341084-050 | ACTUATOR BODY EQUIPPED | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341084-200 | ACTUATOR BODY EQUIPPED | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341084-200 | ACTUATOR BODY EQUIPPED | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341084-300 | ACTUATOR BODY EQUIPPED | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341084-300 | ACTUATOR BODY EQUIPPED | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341084 | ACTUATOR BODY EQUIPPED | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341084 | ACTUATOR BODY EQUIPPED | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341085-200 | EYE END EQUIPPED | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341085-200 | EYE END EQUIPPED | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341085-300 | EYE END EQUIPPED | INSPECT | 3 Days | GOODRICH |
341085-300 | EYE END EQUIPPED | REPAIR | 5 Days | GOODRICH |
341085 | EYE END EQUIPPED | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341085 | EYE END EQUIPPED | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
341086-100 | DETECTION UNIT | INSPECT | 3 Days | GOODRICH |
341086-200 | DETECTION UNIT | INSPECT | 3 Days | GOODRICH |
341202-110 | BODY ACTUATOR ASSY | INSPECT | 3 Days | GOODRICH |
341202-110 | BODY ACTUATOR ASSY | REPAIR | 5 Days | GOODRICH |
341202-300 | BODY ACTUATOR ASSY | INSPECT | 3 Days | GOODRICH |
341202-300 | BODY ACTUATOR ASSY | REPAIR | 5 Days | GOODRICH |
341202-500 | BODY ACTUATOR ASSY | INSPECT | 3 Days | GOODRICH |
341202-500 | BODY ACTUATOR ASSY | REPAIR | 5 Days | GOODRICH |
341202 | BODY ACTUATOR ASSY | INSPECT | 3 Days | GOODRICH |
341202 | BODY ACTUATOR ASSY | REPAIR | 5 Days | GOODRICH |
341203-300 | EYE END ASSY | INSPECT | 3 Days | GOODRICH |
341203-300 | EYE END ASSY | REPAIR | 5 Days | GOODRICH |
341203-400 | EYE END ASSY | INSPECT | 3 Days | GOODRICH |
341203-400 | EYE END ASSY | REPAIR | 5 Days | GOODRICH |
341203-500 | EYE END ASSY | INSPECT | 3 Days | GOODRICH |
341203-500 | EYE END ASSY | REPAIR | 5 Days | GOODRICH |
341203 | EYE END ASSY | INSPECT | 3 Days | GOODRICH |
341203 | EYE END ASSY | REPAIR | 5 Days | GOODRICH |
341204-100 | VALVE BLOCK EQUIPPED BODY | INSPECT | 3 Days | GOODRICH |
341204-110 | VALVE BLOCK EQUIPPED BODY | INSPECT | 3 Days | GOODRICH |
341204-300 | VALVE BLOCK EQUIPPED BODY | INSPECT | 3 Days | GOODRICH |
341319-100 | HARNESS NR 2 | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
341319 | HARNESS NR 2 | INSPECT | 3 Days | GOODRICH |
341525-1 | SHUTOFF ROTARY VALVE | OVERHAUL | 14 Days | |
341525-1 | SHUTOFF ROTARY VALVE | REPAIR | 5 Days | |
341525-1 | SHUTOFF ROTARY VALVE | TEST | 3 Days | |
341525 | VALVE ASSY-2 WAY | OVERHAUL | 14 Days | |
341525 | VALVE ASSY-2 WAY | REPAIR | 5 Days | |
341525 | VALVE ASSY-2 WAY | TEST | 3 Days | |
341531 | DRAINING BODY | INSPECT | 3 Days | GOODRICH |
34265-1 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-1 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-1 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-2 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-2 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-2 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-3 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-3 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-3 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-4 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-4 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-4 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-5 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-5 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-5 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-6 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-6 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-6 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-7 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-7 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265-7 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34265-8 | COCKPIT FLOODLIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265-8 | COCKPIT FLOODLIGHT | REPAIR | 5 Days | HONEYWELL |
34265-8 | COCKPIT FLOODLIGHT | TEST | 3 Days | HONEYWELL |
34265 | COCKPIT LIGHT | OVERHAUL | 14 Days | HONEYWELL |
34265 | COCKPIT LIGHT | REPAIR | 5 Days | HONEYWELL |
34265 | COCKPIT LIGHT | TEST | 3 Days | HONEYWELL |
34800A200-5 | AVIONICS VENTILACION FILTER ASSE | OVERHAUL | 14 Days | DONALDSON AEROSPACE & DEF |
34800A200-5 | AVIONICS VENTILACION FILTER ASSE | REPAIR | 5 Days | DONALDSON AEROSPACE & DEF |
34800A200-5 | AVIONICS VENTILACION FILTER ASSE | TEST | 3 Days | DONALDSON AEROSPACE & DEF |
34800A200-7 | AVIONICS VENTILATION FILTER ASSE | OVERHAUL | 14 Days | DONALDSON AEROSPACE & DEF |
34800A200-7 | AVIONICS VENTILATION FILTER ASSE | REPAIR | 5 Days | DONALDSON AEROSPACE & DEF |
34800A200-7 | AVIONICS VENTILATION FILTER ASSE | TEST | 3 Days | DONALDSON AEROSPACE & DEF |
35990 | DUAL OPERATED SOLENOID SHUTOF | OVERHAUL | 14 Days | STERER |
35990 | DUAL OPERATED SOLENOID SHUTOF | REPAIR | 5 Days | STERER |
35990 | DUAL OPERATED SOLENOID SHUTOF | TEST | 3 Days | STERER |
36500-1 | VALVE SOLENOID | INSPECT | 3 Days | MOOG |
36500-1 | VALVE SOLENOID | REPAIR | 5 Days | MOOG |
37-231 | SERVOVALVE ASSEMBLY | OVERHAUL | 14 Days | CRANE |
37-231 | SERVOVALVE ASSEMBLY | REPAIR | 5 Days | CRANE |
37-231 | SERVOVALVE ASSEMBLY | TEST | 3 Days | CRANE |
37-309 | SERVO VALVE ASSY. | TEST | 3 Days | CRANE |
37-309 | SERVO VALVE ASSY. | REPAIR | 5 Days | CRANE |
37-309 | SERVO VALVE ASSY. | OVERHAUL | 14 Days | CRANE |
37-409-2 | 3-WAY SERVOVALVE ASSY | OVERHAUL | 14 Days | CRANE |
37-409-2 | 3-WAY SERVOVALVE ASSY | REPAIR | 5 Days | CRANE |
37-409-2 | 3-WAY SERVOVALVE ASSY | TEST | 3 Days | CRANE |
37-409-3 | SERVOVALVE ASSY | OVERHAUL | 14 Days | CRANE |
37-409-3 | SERVOVALVE ASSY | REPAIR | 5 Days | CRANE |
37-409-3 | SERVOVALVE ASSY | TEST | 3 Days | CRANE |
37-409 | 3-WAY SERVOVALVE ASSEMBLY | OVERHAUL | 14 Days | CRANE |
37-409 | 3-WAY SERVOVALVE ASSEMBLY | REPAIR | 5 Days | CRANE |
37-409 | 3-WAY SERVOVALVE ASSEMBLY | TEST | 3 Days | CRANE |
37-511-1 | SERVOVALVE ASSY | OVERHAUL | 14 Days | CRANE |
37-511-1 | SERVOVALVE ASSY | REPAIR | 5 Days | CRANE |
37-511-1 | SERVOVALVE ASSY | TEST | 3 Days | CRANE |
3790011-102 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011-102 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011-102 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3790011-103 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011-103 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011-103 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3790011-104 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011-104 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011-104 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3790011-105 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011-105 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011-105 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3790011-106 | SERVO ACTUATOR RUDDER RATION | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011-106 | SERVO ACTUATOR RUDDER RATION | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011-106 | SERVO ACTUATOR RUDDER RATION | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3790011-107 | SERVO ACTUATOR RUDDER RATION | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011-107 | SERVO ACTUATOR RUDDER RATION | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011-107 | SERVO ACTUATOR RUDDER RATION | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3790011L108 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3790011L108 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3790011L108 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
38-669 | VALVE ASSY | OVERHAUL | 14 Days | CRANE |
38-669 | VALVE ASSY | REPAIR | 5 Days | CRANE |
38-669 | VALVE ASSY | TEST | 3 Days | CRANE |
38-775-1 | VALVE ASSY | OVERHAUL | 14 Days | CRANE |
38-775-1 | VALVE ASSY | REPAIR | 5 Days | CRANE |
38-775-1 | VALVE ASSY | TEST | 3 Days | CRANE |
3800022-101 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022-101 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022-101 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3800022-102 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022-102 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022-102 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3800022-103 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022-103 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022-103 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3800022-104 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022-104 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022-104 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3800022-105 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022-105 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022-105 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3800022-106 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022-106 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022-106 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3800022-107 | RUDDER ACTUATOR | OVERHAUL | 14 Days | |
3800022-107 | RUDDER ACTUATOR | REPAIR | 5 Days | |
3800022-107 | RUDDER ACTUATOR | TEST | 3 Days | |
3800022L105 | RUDDER RATIO CHANGER | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3800022L105 | RUDDER RATIO CHANGER | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3800022L105 | RUDDER RATIO CHANGER | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-101 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | GOODRICH |
3810056-101 | THRUST REVERSER MODULE | REPAIR | 5 Days | GOODRICH |
3810056-101 | THRUST REVERSER MODULE | TEST | 3 Days | GOODRICH |
3810056-103 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-103 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-103 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-104 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-104 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-104 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-105 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-105 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-105 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-106 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-106 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-106 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-107 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-107 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-107 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-108 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-108 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-108 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3810056-109 | THRUST REVERSER MODULE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3810056-109 | THRUST REVERSER MODULE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3810056-109 | THRUST REVERSER MODULE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
381598-1001 | LVDT | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
381800-1001 | LEADING EDGE SLAT ACTUATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
381800-1001 | LEADING EDGE SLAT ACTUATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
381800-1001 | LEADING EDGE SLAT ACTUATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
381800-1003 | LEADING EDGE SLAT ACTUATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
381800-1003 | LEADING EDGE SLAT ACTUATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
381800-1003 | LEADING EDGE SLAT ACTUATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
381800-1005 | LEADING EDGE SLAT ACTUATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
381800-1005 | LEADING EDGE SLAT ACTUATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
381800-1005 | LEADING EDGE SLAT ACTUATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-101 | VALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-101 | VALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-101 | VALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-102 | VALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-102 | VALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-102 | VALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-103 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-103 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-103 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-104 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-104 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-104 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-105 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-105 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-105 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-106 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-106 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-106 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3820007-107 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3820007-107 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3820007-107 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
382010-1001 | VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
382010-1001 | VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
382010-1001 | VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
382046-1 | ROD END ASSEMBLY LEADING EDGE | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
382046-3 | ROD END | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
3821075-101 | SWITCH ASSY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3821075-101 | SWITCH ASSY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3821075-101 | SWITCH ASSY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3821075-103 | SWITCH ASSY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3821075-103 | SWITCH ASSY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3821075-103 | SWITCH ASSY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
3821075-104 | SWITCH ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
3821075-104 | SWITCH ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
3821075-104 | SWITCH ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
38215-262 | SOLENOID | INSPECT | 3 Days | COLLINS AEROSPACE |
39-249-1 | DUAL PRESSURE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-249-1 | DUAL PRESSURE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-249-1 | DUAL PRESSURE CONTROL VALVE | TEST | 3 Days | CRANE |
39-249-2 | DUAL PRESSURE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-249-2 | DUAL PRESSURE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-249-2 | DUAL PRESSURE CONTROL VALVE | TEST | 3 Days | CRANE |
39-249 | DUAL PRESSURE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-249 | DUAL PRESSURE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-249 | DUAL PRESSURE CONTROL VALVE | TEST | 3 Days | CRANE |
39-249502-2 | SOLENOID ASSY | INSPECT | 3 Days | CRANE |
39-249502-2 | SOLENOID ASSY | REPAIR | CRANE | |
39-249502-2 | SOLENOID ASSY | OVERHAUL | CRANE | |
39-353 | CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-353 | CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-353 | CONTROL VALVE | TEST | 3 Days | CRANE |
39-617 | ANTISKID CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-617 | ANTISKID CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-617 | ANTISKID CONTROL VALVE | TEST | 3 Days | CRANE |
39-61719 | SLIDE AND SLEEVE LAP ASSY | INSPECT | 3 Days | CRANE |
39-777-1 | SERVOVALVE ASSEMBLY | OVERHAUL | 14 Days | CRANE |
39-777-1 | SERVOVALVE ASSEMBLY | REPAIR | 5 Days | CRANE |
39-777-1 | SERVOVALVE ASSEMBLY | TEST | 3 Days | CRANE |
39-77745 | SLIDE AND SLEEVE LAP ASSY | INSPECT | 3 Days | CRANE |
39-891-1 | BRAKE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-891-1 | BRAKE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-891-1 | BRAKE CONTROL VALVE | TEST | 3 Days | CRANE |
39-891-2 | BRAKE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-891-2 | BRAKE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-891-2 | BRAKE CONTROL VALVE | TEST | 3 Days | CRANE |
39-891-3 | BRAKE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-891-3 | BRAKE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-891-3 | BRAKE CONTROL VALVE | TEST | 3 Days | CRANE |
39-891 | BRAKE CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
39-891 | BRAKE CONTROL VALVE | REPAIR | 5 Days | CRANE |
39-891 | BRAKE CONTROL VALVE | TEST | 3 Days | CRANE |
394100-1001 | SHUTOFF VALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
394100-1001 | SHUTOFF VALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
394100-1001 | SHUTOFF VALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
394100-1003 | SHUTOFF VALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
394100-1003 | SHUTOFF VALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
394100-1003 | SHUTOFF VALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
394357 | SOLENOID VALVE | OVERHAUL | 14 Days | EATON |
394357 | SOLENOID VALVE | REPAIR | 5 Days | EATON |
394357 | SOLENOID VALVE | TEST | 3 Days | EATON |
40023-400-1 | SLIDE AND SLEEVE | INSPECT | 3 Days | SARGENT INDUSTRIES ENERGY |
401-09772-03 | SOLENOID VALVE ASSEMBLY | INSPECT | 3 Days | MOOG |
401-09772-03 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | MOOG |
401-09772-04 | SOLENOID VALVE ASSEMBLY | INSPECT | 3 Days | MOOG |
401-09772-04 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | MOOG |
402K200-1 | HOUSING ASSEMBLY | INSPECT | 3 Days | DONALDSON AEROSPACE & DEF |
402K200-1 | HOUSING ASSEMBLY | OVERHAUL | 14 Days | DONALDSON AEROSPACE & DEF |
402K200-1 | HOUSING ASSEMBLY | REPAIR | 5 Days | DONALDSON AEROSPACE & DEF |
402K200-2 | HOUSING | OVERHAUL | 14 Days | DONALDSON AEROSPACE & DEF |
402K200-2 | HOUSING | REPAIR | 5 Days | DONALDSON AEROSPACE & DEF |
402K200-2 | HOUSING | TEST | 3 Days | DONALDSON AEROSPACE & DEF |
40340-10009 | VALVE ASSEMBLY | OVERHAUL | 14 Days | KAYABA INDUSTRY CO. |
40340-10009 | VALVE ASSEMBLY | REPAIR | 5 Days | KAYABA INDUSTRY CO. |
40340-10009 | VALVE ASSEMBLY | TEST | 3 Days | KAYABA INDUSTRY CO. |
40340-10013 | VALVE ASSY | OVERHAUL | 14 Days | KAYABA INDUSTRY CO. |
40340-10013 | VALVE ASSY | REPAIR | 5 Days | KAYABA INDUSTRY CO. |
40340-10013 | VALVE ASSY | TEST | 3 Days | KAYABA INDUSTRY CO. |
41-2-2020-01 | DC MOTOR | INSPECT | 3 Days | ELEKTRO-METAL |
41-2-2020 | DC MOTOR | INSPECT | 3 Days | ELEKTRO-METAL |
41-2-2052 | MOTOR DC | INSPECT | 3 Days | ELEKTRO-METAL |
41SG240-1 | DIFFERENTIAL PRESSURE TRANSDU | OVERHAUL | 14 Days | EATON |
41SG240-1 | DIFFERENTIAL PRESSURE TRANSDU | REPAIR | 5 Days | EATON |
41SG240-1 | DIFFERENTIAL PRESSURE TRANSDU | TEST | 3 Days | EATON |
41SG240-4 | DIFFERENTIAL PRESSURE TRANSDU | OVERHAUL | 14 Days | EATON |
41SG240-4 | DIFFERENTIAL PRESSURE TRANSDU | REPAIR | 5 Days | EATON |
41SG240-4 | DIFFERENTIAL PRESSURE TRANSDU | TEST | 3 Days | EATON |
422081-100 | POSITION TRANDUCER UNIT | INSPECT | 3 Days | COLLINS AEROSPACE |
422081 | POSITION TRANSDUCER UNIT | INSPECT | 3 Days | COLLINS AEROSPACE |
422136 | OIL BREATHER | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
42D107A1 | DIFFERENTIAL PRESSURE SWITCH | OVERHAUL | 15 Days | CUSTOM CONTROL SENSORS |
42D107A1 | DIFFERENTIAL PRESSURE SWITCH | INSPECT | 3 Days | CUSTOM CONTROL SENSORS |
42D107A1 | DIFFERENTIAL PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM CONTROL SENSORS |
42D107A2 | DIFFERENTIAL PRESSURE SWITCH | INSPECT | 3 Days | CUSTOM CONTROL SENSORS |
42D107A2 | DIFFERENTIAL PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM CONTROL SENSORS |
42D107A2 | DIFFERENTIAL PRESSURE SWITCH | OVERHAUL | 15 Days | CUSTOM CONTROL SENSORS |
450-1-3100-00 | SWITCH | INSPECT | 3 Days | ELEKTRO-METAL |
45080-1 | VALVE ASSY SOLENOID | OVERHAUL | 14 Days | EATON |
45080-1 | VALVE ASSY SOLENOID | TEST | 3 Days | EATON |
45080-1 | VALVE ASSY SOLENOID | REPAIR | 5 Days | EATON |
45080 | VALVE ASSY SOLENOID | OVERHAUL | 14 Days | EATON |
45080 | VALVE ASSY SOLENOID | REPAIR | 5 Days | EATON |
45080 | VALVE ASSY SOLENOID | TEST | 3 Days | EATON |
45D31 | PRESSURE DIFFERENTIAL SWITCH | OVERHAUL | 14 Days | GOODRICH |
45D31 | PRESSURE DIFFERENTIAL SWITCH | REPAIR | 5 Days | GOODRICH |
45D31 | PRESSURE DIFFERENTIAL SWITCH | TEST | 3 Days | GOODRICH |
48-00R22-19P-306 | CONNECTOR, ELECTRICAL | INSPECT | 3 Days | MOOG |
48-00R22-19P106 | CONNECTOR, ELECTRICAL | INSPECT | 3 Days | MOOG |
48-00R2219P-30 | CONNECTOR ELECTRICAL | INSPECT | 3 Days | MOOG |
485000-14 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
485000-14 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
490142 | NO BACK HOUSING | INSPECT | 3 Days | COLLINS AEROSPACE |
490172 | PRIMARY PIN | INSPECT | 3 Days | COLLINS AEROSPACE |
490178 | PRIMARY NUT | INSPECT | 3 Days | COLLINS AEROSPACE |
50-0177-1 | RUNWAY TURNOFF FLOODLIGHT | OVERHAUL | 14 Days | HONEYWELL |
50-0177-1 | RUNWAY TURNOFF FLOODLIGHT | REPAIR | 5 Days | HONEYWELL |
50-0177-1 | RUNWAY TURNOFF FLOODLIGHT | TEST | 3 Days | HONEYWELL |
50-0177-3 | RUNAWAY TURN OFF LIGHT | OVERHAUL | 14 Days | HONEYWELL |
50-0177-3 | RUNAWAY TURN OFF LIGHT | REPAIR | 5 Days | HONEYWELL |
50-0177-3 | RUNAWAY TURN OFF LIGHT | TEST | 3 Days | HONEYWELL |
50-1-3100-00 | SWITCH | INSPECT | 3 Days | ELEKTRO-METAL |
50-2-3100-00 | PRESSURE SWITCH | INSPECT | 3 Days | ELEKTRO-METAL |
5000C5091-02 | RVDT | INSPECT | 3 Days | |
500B0000-01 | SOLENOID | INSPECT | 3 Days | LIEBHERR |
516038-1 | AC MOTOR | INSPECT | 3 Days | HONEYWELL |
516038-2 | AC MOTOR | INSPECT | 3 Days | HONEYWELL |
516038-3 | AC MOTOR | INSPECT | 3 Days | HONEYWELL |
516038-4 | AC MOTOR | INSPECT | 3 Days | HONEYWELL |
516038-5 | AC MOTOR | INSPECT | 3 Days | HONEYWELL |
533052-1 | GEARSHAFT WORM AND SPUR | INSPECT | 3 Days | HONEYWELL |
568-1-27687-000 | IMPELLER ASSY REPRIME AND PIN | INSPECT | 3 Days | EATON |
568-1-27936-000 | PUMP HOUSING AND INSERT ASSY | INSPECT | 3 Days | EATON |
568-1-28549-000 | PUMP HOUSING AND INSERT ASSY | INSPECT | 3 Days | EATON |
568-1-30049-000 | PUMP HOUSING AND INSERT ASSY S | INSPECT | 3 Days | EATON |
571813 | SOLENOID VALVE | OVERHAUL | 14 Days | EATON |
571813 | SOLENOID VALVE | REPAIR | 5 Days | EATON |
571813 | SOLENOID VALVE | TEST | 3 Days | EATON |
5751A0000-01 | SOLENOID VALVE | OVERHAUL | 14 Days | LIEBHERR |
5751A0000-01 | SOLENOID VALVE | REPAIR | 5 Days | LIEBHERR |
5751A0000-01 | SOLENOID VALVE | TEST | 3 Days | LIEBHERR |
5751A0000-02 | SOLENOID VALVE | OVERHAUL | 14 Days | LIEBHERR |
5751A0000-02 | SOLENOID VALVE | REPAIR | 5 Days | LIEBHERR |
5751A0000-02 | SOLENOID VALVE | TEST | 3 Days | LIEBHERR |
5862026-103 | LVDT-DUAL | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
59600-5003 | HYDRAULIC SOLENOID CONTROL VAL | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
59600-5003 | HYDRAULIC SOLENOID CONTROL VAL | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
59600-5003 | HYDRAULIC SOLENOID CONTROL VAL | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
59600-5007 | VALVE ASSY SOLENOID | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
59600-5007 | VALVE ASSY SOLENOID | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
59600-5007 | VALVE ASSY SOLENOID | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
59600-5009 | HYDRAULIC SOLENOID CONTROL VAL | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
59600-5009 | HYDRAULIC SOLENOID CONTROL VAL | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
59600-5009 | HYDRAULIC SOLENOID CONTROL VAL | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
59600-5011 | VALVE ASSY SOLENOID | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
59600-5011 | VALVE ASSY SOLENOID | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
59600-5011 | VALVE ASSY SOLENOID | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
6-1404-0000-4 | HAND PUMP | OVERHAUL | 14 Days | ASG LUFTHAHRTTECHNIK |
6-1404-0000-4 | HAND PUMP | REPAIR | 5 Days | ASG LUFTHAHRTTECHNIK |
6-1404-0000-4 | HAND PUMP | TEST | 3 Days | ASG LUFTHAHRTTECHNIK |
60B00216-7 | VALVE ASSEMBLY | OVERHAUL | 14 Days | KAYABA INDUSTRY CO. |
60B00216-7 | VALVE ASSEMBLY | REPAIR | 5 Days | KAYABA INDUSTRY CO. |
60B00216-7 | VALVE ASSEMBLY | TEST | 3 Days | KAYABA INDUSTRY CO. |
60B00216-8 | VALVE ASSEMBLY | OVERHAUL | 14 Days | KAYABA INDUSTRY CO. |
60B00216-8 | VALVE ASSEMBLY | REPAIR | 5 Days | KAYABA INDUSTRY CO. |
60B00216-8 | VALVE ASSEMBLY | TEST | 3 Days | KAYABA INDUSTRY CO. |
60B80044 | CONTROL MODULE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
60B80044 | CONTROL MODULE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
60B80044 | CONTROL MODULE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
60B92400-6 | CAGE PRESSURE SWITCH | INSPECT | 3 Days | CUSTOM COMPONENT SWITCH |
60B92400-6 | CAGE PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM COMPONENT SWITCH |
6197-1 | LIMITER, BRAKE, FLUID QTY | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
6197-1 | LIMITER, BRAKE, FLUID QTY | REPAIR | 5 Days | PNEUDRAULICS INC. |
6197-1 | LIMITER, BRAKE, FLUID QTY | TEST | 3 Days | PNEUDRAULICS INC. |
6197 | FLUID QTY BRAKE LIMITER | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
6197 | FLUID QTY BRAKE LIMITER | REPAIR | 5 Days | PNEUDRAULICS INC. |
6197 | FLUID QTY BRAKE LIMITER | TEST | 3 Days | PNEUDRAULICS INC. |
62630-1 | RELIEF VALVE ASSEMBLY | OVERHAUL | 14 Days | STERER |
62630-1 | RELIEF VALVE ASSEMBLY | REPAIR | 5 Days | STERER |
62630-1 | RELIEF VALVE ASSEMBLY | TEST | 3 Days | STERER |
65-17821-18 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-17821-18 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65-17821-18 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65-17821-20 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-17821-20 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65-17821-20 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65-17821-21 | HYDRAULIC MODULAR PACKAGE | OVERHAUL | 14 Days | BOEING |
65-17821-21 | HYDRAULIC MODULAR PACKAGE | REPAIR | 5 Days | BOEING |
65-17821-21 | HYDRAULIC MODULAR PACKAGE | TEST | 3 Days | BOEING |
65-17821-22 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-17821-22 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65-17821-22 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65-17821-23 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-17821-23 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65-17821-23 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65-44503-10 | FEEL ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44503-10 | FEEL ACTUATOR | REPAIR | 5 Days | BOEING |
65-44503-10 | FEEL ACTUATOR | TEST | 3 Days | BOEING |
65-44503-7 | FEEL ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44503-7 | FEEL ACTUATOR | REPAIR | 5 Days | BOEING |
65-44503-7 | FEEL ACTUATOR | TEST | 3 Days | BOEING |
65-44503-8 | FEEL ACTUATOR CYLINDER ASSEMB | OVERHAUL | 14 Days | BOEING |
65-44503-8 | FEEL ACTUATOR CYLINDER ASSEMB | REPAIR | 5 Days | BOEING |
65-44503-8 | FEEL ACTUATOR CYLINDER ASSEMB | TEST | 3 Days | BOEING |
65-44550-14 | LEADING EDGE FLAP ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44550-14 | LEADING EDGE FLAP ACTUATOR | REPAIR | 5 Days | BOEING |
65-44550-14 | LEADING EDGE FLAP ACTUATOR | TEST | 3 Days | BOEING |
65-44550-15 | LEADING EDGE FLAP ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44550-15 | LEADING EDGE FLAP ACTUATOR | REPAIR | 5 Days | BOEING |
65-44550-15 | LEADING EDGE FLAP ACTUATOR | TEST | 3 Days | BOEING |
65-44550-16 | LEADING EDGE FLAP ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44550-16 | LEADING EDGE FLAP ACTUATOR | REPAIR | 5 Days | BOEING |
65-44550-16 | LEADING EDGE FLAP ACTUATOR | TEST | 3 Days | BOEING |
65-44550-18 | LEADING EDGE FLAP ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44550-18 | LEADING EDGE FLAP ACTUATOR | REPAIR | 5 Days | BOEING |
65-44550-18 | LEADING EDGE FLAP ACTUATOR | TEST | 3 Days | BOEING |
65-44550-20 | LEADING EDGE FLAP ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44550-20 | LEADING EDGE FLAP ACTUATOR | REPAIR | 5 Days | BOEING |
65-44550-20 | LEADING EDGE FLAP ACTUATOR | TEST | 3 Days | BOEING |
65-44551-5 | LEADING EDGE FLAP ACTUATOR ASS | OVERHAUL | 14 Days | BOEING |
65-44551-5 | LEADING EDGE FLAP ACTUATOR ASS | REPAIR | 5 Days | BOEING |
65-44551-5 | LEADING EDGE FLAP ACTUATOR ASS | TEST | 3 Days | BOEING |
65-44551-6 | SLAT ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44551-6 | SLAT ACTUATOR | REPAIR | 5 Days | BOEING |
65-44551-6 | SLAT ACTUATOR | TEST | 3 Days | BOEING |
65-44551-7 | LEADING EDGE FLAP ACTUATOR ASS | OVERHAUL | 14 Days | BOEING |
65-44551-7 | LEADING EDGE FLAP ACTUATOR ASS | REPAIR | 5 Days | BOEING |
65-44551-7 | LEADING EDGE FLAP ACTUATOR ASS | TEST | 3 Days | BOEING |
65-44551-9 | LH K-FLAP ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44551-9 | LH K-FLAP ACTUATOR | REPAIR | 5 Days | BOEING |
65-44551-9 | LH K-FLAP ACTUATOR | TEST | 3 Days | BOEING |
65-44559-1 | BARREL ASSY | INSPECT | 3 Days | BOEING DISTRIBUTION |
65-44561-10 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-10 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-10 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-11 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-11 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-11 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-12 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-12 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-12 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-13 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-13 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-13 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-14 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-14 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-14 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-15 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-15 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-15 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-5 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-5 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-5 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-6 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-6 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-6 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-7 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-7 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-7 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-8 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-8 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-8 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44561-9 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44561-9 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44561-9 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44580-15 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-44580-15 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65-44580-15 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65-44580-17 | PRESSUREMODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-44580-17 | PRESSUREMODULAR ASSY | REPAIR | 5 Days | BOEING |
65-44580-17 | PRESSUREMODULAR ASSY | TEST | 3 Days | BOEING |
65-44580-19 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65-44580-19 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65-44580-19 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65-44680-10 | STANDBY SYSTEM MODULAR PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-10 | STANDBY SYSTEM MODULAR PACKA | REPAIR | 5 Days | BOEING |
65-44680-10 | STANDBY SYSTEM MODULAR PACKA | TEST | 3 Days | BOEING |
65-44680-11 | STANDBY SYSTEM MODULAR PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-11 | STANDBY SYSTEM MODULAR PACKA | REPAIR | 5 Days | BOEING |
65-44680-11 | STANDBY SYSTEM MODULAR PACKA | TEST | 3 Days | BOEING |
65-44680-12 | STANDBY SYSTEM MODULAR PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-12 | STANDBY SYSTEM MODULAR PACKA | REPAIR | 5 Days | BOEING |
65-44680-12 | STANDBY SYSTEM MODULAR PACKA | TEST | 3 Days | BOEING |
65-44680-14 | STANDBY SYSTEM MODULAR PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-14 | STANDBY SYSTEM MODULAR PACKA | REPAIR | 5 Days | BOEING |
65-44680-14 | STANDBY SYSTEM MODULAR PACKA | TEST | 3 Days | BOEING |
65-44680-15 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-15 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-15 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-16 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-16 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-16 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-17 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-17 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-17 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-18 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-18 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-18 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-19 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-19 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-19 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-2 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-2 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-2 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-4 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-4 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-4 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-5 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-5 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-5 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-6 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-6 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-6 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44680-7 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44680-7 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44680-7 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-1 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-1 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-1 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-10 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-10 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-10 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-11 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-11 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-11 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-14 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-14 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-14 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-15 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-15 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-15 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-16 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-16 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-16 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-17 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-17 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-17 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-18 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-18 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-18 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-19 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-19 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-19 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-3 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-3 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-3 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-4 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-4 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-4 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-5 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-5 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-5 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-6 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-6 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-6 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44681-9 | STANDBY SYSTEM MODULAT PACKA | OVERHAUL | 14 Days | BOEING |
65-44681-9 | STANDBY SYSTEM MODULAT PACKA | REPAIR | 5 Days | BOEING |
65-44681-9 | STANDBY SYSTEM MODULAT PACKA | TEST | 3 Days | BOEING |
65-44741-8 | VAVLE ASSY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
65-44741-8 | VAVLE ASSY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
65-44741-8 | VAVLE ASSY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
65-44851-10 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-10 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-10 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-12 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-12 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-12 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-13 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-13 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-13 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-14 | GROUND SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-44851-14 | GROUND SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-44851-14 | GROUND SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-44851-3 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-3 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-3 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-4 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-4 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-4 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-5 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-5 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-5 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-6 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-6 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-6 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-44851-7 | GROUND SPOILER LOCKING ACTUAT | OVERHAUL | 14 Days | BOEING |
65-44851-7 | GROUND SPOILER LOCKING ACTUAT | REPAIR | 5 Days | BOEING |
65-44851-7 | GROUND SPOILER LOCKING ACTUAT | TEST | 3 Days | BOEING |
65-49580-11 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-11 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-11 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-12 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-12 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-12 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-13 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-13 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-13 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-14 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-14 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-14 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-15 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-15 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-15 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-16 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-16 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-16 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-17 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-17 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-17 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-18 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-18 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-18 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-19 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-19 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-19 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-20 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-20 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-20 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-49580-21 | SPOILER ACTUATOR | OVERHAUL | 14 Days | BOEING |
65-49580-21 | SPOILER ACTUATOR | REPAIR | 5 Days | BOEING |
65-49580-21 | SPOILER ACTUATOR | TEST | 3 Days | BOEING |
65-51632-7 | LEVER | INSPECT | 3 Days | BOEING |
65-51632-7 | LEVER | REPAIR | 5 Days | BOEING |
65400 | VALVE ASSY SOLENOID | OVERHAUL | 14 Days | EATON |
65400 | VALVE ASSY SOLENOID | REPAIR | 5 Days | EATON |
65400 | VALVE ASSY SOLENOID | TEST | 3 Days | EATON |
65860-1 | VALVE | OVERHAUL | 14 Days | EATON |
65860-1 | VALVE | REPAIR | 5 Days | EATON |
65860-1 | VALVE | TEST | 3 Days | EATON |
65860 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | EATON |
65860 | MOTOR OPERATED VALVE | REPAIR | 5 Days | EATON |
65860 | MOTOR OPERATED VALVE | TEST | 3 Days | EATON |
65B01512-830 | TUBE ASSY | INSPECT | 3 Days | BOEING |
65B01514-1 | TRUNNION ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01514-11 | TRUNNION ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01514-5 | TRUNNION ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01514-7 | TRUNNION ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01514-9 | TRUNNION ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01536-1 | HEAD END | INSPECT | 3 Days | BOEING |
65B01536-2 | HEAD END | INSPECT | 3 Days | BOEING |
65B01537-1 | ROD END ASSY | INSPECT | 3 Days | BOEING |
65B01537-11 | ROD END ASSY | INSPECT | 3 Days | BOEING |
65B01537-12 | ROD END ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01537-5 | ROD END ASSY | INSPECT | 3 Days | BOEING |
65B01537-9 | ROD END ASSY | INSPECT | 3 Days | BOEING |
65B01559-1 | BARREL | INSPECT | 3 Days | BOEING |
65B01559-1 | BARREL | REPAIR | 5 Days | BOEING |
65B01564-1 | HEAD END ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01564-1 | HEAD END ASSEMBLY | REPAIR | 5 Days | BOEING |
65B01564-10 | HEAD END ASSY | INSPECT | 3 Days | BOEING |
65B01564-10 | HEAD END ASSY | REPAIR | 5 Days | BOEING |
65B01564-6 | HEAD END ASSEMBLY | INSPECT | 3 Days | BOEING |
65B01564-6 | HEAD END ASSEMBLY | REPAIR | 5 Days | BOEING |
65B01564-8 | HEAD END ASSY | INSPECT | 3 Days | BOEING |
65B01564-8 | HEAD END ASSY | REPAIR | 5 Days | BOEING |
65B01574-1 | BARREL | INSPECT | 3 Days | BOEING |
65B01574-1 | BARREL | REPAIR | 5 Days | BOEING |
65B01578-2 | PISTON | INSPECT | 3 Days | BOEING |
65B01578-3 | PISTON | INSPECT | 3 Days | BOEING |
65B01587-1 | ROD-PISTON | INSPECT | 3 Days | BOEING |
65B01587-1 | ROD-PISTON | REPAIR | 5 Days | BOEING |
65B83205-15 | TUBE ASSY | INSPECT | 3 Days | BOEING |
65B83205-16 | TUBE ASSY | INSPECT | 3 Days | BOEING |
65B83205-29 | TUBE ASSY | INSPECT | 3 Days | BOEING |
65C26873-3 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65C26873-3 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65C26873-3 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65C26873-4 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65C26873-4 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65C26873-4 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65C26873-5 | PRESSURE MODULAR ASSY | OVERHAUL | 14 Days | BOEING |
65C26873-5 | PRESSURE MODULAR ASSY | REPAIR | 5 Days | BOEING |
65C26873-5 | PRESSURE MODULAR ASSY | TEST | 3 Days | BOEING |
65C36725-1 | AUTOTHROTTLE SWITCH PACK ASSE | OVERHAUL | 14 Days | BOEING |
65C36725-1 | AUTOTHROTTLE SWITCH PACK ASSE | REPAIR | 5 Days | BOEING |
65C36725-1 | AUTOTHROTTLE SWITCH PACK ASSE | TEST | 3 Days | BOEING |
662160-4 | RESISTOR ASSY. | INSPECT | 3 Days | HONEYWELL |
666021-100 | PICK OFF POSITION | TEST | 3 Days | LUCAS AIR EQUIPMENT |
666040 | PICK OFF POSITION | TEST | 3 Days | LUCAS AIR EQUIPMENT |
666041 | DETECTOR | INSPECT | 3 Days | SENSOREX |
666042-100 | LINER DETECTOR LVDT | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
666042-200 | DETECTOR LINEAR LVDT | INSPECT | 3 Days | GOODRICH |
666050 | LVDT | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
666060 | RVDT | INSPECT | 3 Days | GOODRICH |
66940-3 | SOLENOID VALVE | OVERHAUL | 14 Days | STERER |
66940-3 | SOLENOID VALVE | REPAIR | 5 Days | STERER |
66940-3 | SOLENOID VALVE | TEST | 3 Days | STERER |
66940 | SOLENOID VALVE ASSY | OVERHAUL | 14 Days | STERER |
66940 | SOLENOID VALVE ASSY | REPAIR | 5 Days | STERER |
66940 | SOLENOID VALVE ASSY | TEST | 3 Days | STERER |
684SC112-1 | MOTOR DIRECT CURRENT | INSPECT | 3 Days | EATON |
684SC112-3 | MOTOR | INSPECT | 3 Days | EATON |
684SC112-5 | MOTOR DIRECT CURRENT | INSPECT | 3 Days | EATON |
69660-1 | VALVE | OVERHAUL | 14 Days | EATON |
69660-1 | VALVE | REPAIR | 5 Days | EATON |
69660-1 | VALVE | TEST | 3 Days | EATON |
69660-3 | VALVE | OVERHAUL | 14 Days | EATON |
69660-3 | VALVE | REPAIR | 5 Days | EATON |
69660-3 | VALVE | TEST | 3 Days | EATON |
69660 | SOLENOID VALVE | OVERHAUL | 14 Days | EATON |
69660 | SOLENOID VALVE | REPAIR | 5 Days | EATON |
69660 | SOLENOID VALVE | TEST | 3 Days | EATON |
70000Y12-12P6 | CONNECTOR | INSPECT | 3 Days | GE AVIATION |
70400 | VALVE-RELIEF | OVERHAUL | 14 Days | SITEC AEROSPACE |
70400 | VALVE-RELIEF | REPAIR | 5 Days | SITEC AEROSPACE |
70400 | VALVE-RELIEF | TEST | 3 Days | SITEC AEROSPACE |
71190400010NC0A | SAMPLING VALVE | OVERHAUL | 14 Days | SOFRANCE |
71190400010NC0A | SAMPLING VALVE | REPAIR | 5 Days | SOFRANCE |
71190400010NC0A | SAMPLING VALVE | TEST | 3 Days | SOFRANCE |
71234 | HYDRAULIC HAND PUMP ASSY | OVERHAUL | 14 Days | CRANE |
71234 | HYDRAULIC HAND PUMP ASSY | REPAIR | 5 Days | CRANE |
71234 | HYDRAULIC HAND PUMP ASSY | TEST | 3 Days | CRANE |
74149 | AUTOBRAKE MODULE ASSY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
74149 | AUTOBRAKE MODULE ASSY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
74149 | AUTOBRAKE MODULE ASSY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
74150 | PRESSURE CONTROL SERVOVALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
74150 | PRESSURE CONTROL SERVOVALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
74150 | PRESSURE CONTROL SERVOVALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
746078-1 | MASTER CYLINDER | OVERHAUL | 14 Days | SAFRAN |
746078-1 | MASTER CYLINDER | REPAIR | 5 Days | SAFRAN |
746078-1 | MASTER CYLINDER | TEST | 3 Days | SAFRAN |
746078-101 | MASTER CYLINDER | OVERHAUL | 14 Days | SAFRAN |
746078-101 | MASTER CYLINDER | REPAIR | 5 Days | SAFRAN |
746078-101 | MASTER CYLINDER | TEST | 3 Days | SAFRAN |
746078-102 | MASTER CYLINDER | OVERHAUL | 14 Days | SAFRAN |
746078-102 | MASTER CYLINDER | REPAIR | 5 Days | SAFRAN |
746078-102 | MASTER CYLINDER | TEST | 3 Days | SAFRAN |
747892-1-1 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-1-1 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-1-1 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-1-2 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-1-2 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-1-2 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-1 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-1 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-1 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-103 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-103 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-103 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-104 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-104 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-104 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-3 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-3 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-3 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-301 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-301 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-301 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-302 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-302 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-302 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-403 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-403 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-403 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
747892-404 | SPOILER ACTUATING CYLINDER | OVERHAUL | 14 Days | MESSIER-BUGATTI |
747892-404 | SPOILER ACTUATING CYLINDER | REPAIR | 5 Days | MESSIER-BUGATTI |
747892-404 | SPOILER ACTUATING CYLINDER | TEST | 3 Days | MESSIER-BUGATTI |
749510 | BODY | INSPECT | 3 Days | MESSIER-BUGATTI |
749935 | LINER ASSY | INSPECT | 3 Days | MESSIER-BUGATTI |
749935 | LINER ASSY | REPAIR | 5 Days | MESSIER-BUGATTI |
750-0104 | LEVER MANUAL | INSPECT | 3 Days | LIEBHERR |
750-0117 | LEVER MANUAL | INSPECT | 3 Days | LIEBHERR |
7563882 | INDICATOR-120 PSID | INSPECT | 3 Days | BOEING |
7563882 | INDICATOR-120 PSID | REPAIR | 5 Days | BOEING |
7563889 | INDICATOR | INSPECT | 3 Days | BOEING |
7563890 | INDICATOR-30 PSID | INSPECT | 3 Days | BOEING |
7586630 | INDICATOR-DIFF PRESSURE HYDR | INSPECT | 3 Days | BOEING |
7586631 | INDICATOR-DIFF PRESSURE HYDR | INSPECT | 3 Days | BOEING |
762080003 | SAFETY VALVE | OVERHAUL | 14 Days | MESSIER-BUGATTI |
762080003 | SAFETY VALVE | REPAIR | 5 Days | MESSIER-BUGATTI |
762080003 | SAFETY VALVE | TEST | 3 Days | MESSIER-BUGATTI |
77144-01 | CONTROL MODULE ASSY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
77144-01 | CONTROL MODULE ASSY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
77144-01 | CONTROL MODULE ASSY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
77144-02 | CONTROL MODULE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
77144-02 | CONTROL MODULE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
77144-02 | CONTROL MODULE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
77144-04 | CONTROL MODULE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
77144-04 | CONTROL MODULE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
77144-04 | CONTROL MODULE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
77144 | CONTROL MODULE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
77144 | CONTROL MODULE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
77144 | CONTROL MODULE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
773A0000-01 | SENSOR-TEMPERATURE | INSPECT | 3 Days | LIEBHERR |
776-243 | MOTOR | INSPECT | 3 Days | LIEBHERR |
776-450 | MOTOR | INSPECT | 3 Days | LIEBHERR |
776270-1 | MOTOR | INSPECT | 3 Days | LIEBHERR |
776271-1 | MOTOR | INSPECT | 3 Days | LIEBHERR |
776808 | MOTOR | INSPECT | 3 Days | LIEBHERR |
786A1400-01 | TUBE TRANSFER | INSPECT | 3 Days | LIEBHERR |
789721-1 | TRANSDUCER AND CONTACTS | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
789722-1 | TRANSDUCER AND CONTACTS | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
7918282-5001 | FLUID QTY BRAKE LIMITER | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
7918282-5001 | FLUID QTY BRAKE LIMITER | REPAIR | 5 Days | PNEUDRAULICS INC. |
7918282-5001 | FLUID QTY BRAKE LIMITER | TEST | 3 Days | PNEUDRAULICS INC. |
7918282-5501 | FLUID QTY BRAKE LIMITER | OVERHAUL | 14 Days | PNEUDRAULICS INC. |
7918282-5501 | FLUID QTY BRAKE LIMITER | REPAIR | 5 Days | PNEUDRAULICS INC. |
7918282-5501 | FLUID QTY BRAKE LIMITER | TEST | 3 Days | PNEUDRAULICS INC. |
798602-1 | TRANSDUCER AND CONTACTS | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
7G110-6 | SWITCH | INSPECT | 3 Days | CUSTOM COMPONENT SWITCH |
7G110-6 | SWITCH | REPAIR | 5 Days | CUSTOM COMPONENT SWITCH |
8-372-01 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-372-02 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-372-04 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-372-05 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-484-01 | PROXIMITY SENSO | INSPECT | 3 Days | CRANE |
8-527-01 | SWITCH PROXIMITY | INSPECT | 3 Days | CRANE |
8-527-03 | SWITCH PROXIMITY | INSPECT | 3 Days | CRANE |
8-689-01 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-689-02 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-695-01 | PROXIMITY SENSOR | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-731-01 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-731-02 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-732-01 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-732-02 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-788-01 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-788-02 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-840-01 | SENSOR PROXIMITY | INSPECT | 3 Days | CRANE AEROSPACE & ELECTR |
8-840-02 | PROXIMITY SWITCH SENSOR | INSPECT | 3 Days | CRANE |
8-933-01 | SENSOR | INSPECT | 3 Days | CRANE |
80-057-01 | PROXIMITY SWITCH | INSPECT | 3 Days | CRANE |
802453 | LVDT | INSPECT | 3 Days | |
805809 | END PIECE | INSPECT | 3 Days | COLLINS AEROSPACE |
806811-1 | TRANSDUCER AND CONTACTS | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
806812-1 | TRANSDUCER AND CONTACTS | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
815851 | END PIECE | INSPECT | 3 Days | COLLINS AEROSPACE |
81787 | PISTON ASSY. | INSPECT | 3 Days | |
81797 | BODY | INSPECT | 3 Days | CRANE |
819779-1 | ACTUATOR PISTON | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
819779-1 | ACTUATOR PISTON | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
819779-10 | PISTON | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
819779-10 | PISTON | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
819779-2 | PISTON, ACTUATOR | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
819779-2 | PISTON, ACTUATOR | REPAIR | 5 Days | UTC AEROSPACE SYSTEMS |
819798-1 | LINEAR TRANSDUCER | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
819847-1 | TRANSDUCER AND CONTACTS | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
83151036 | SENSITIVE SWITCH | INSPECT | 3 Days | COLLINS AEROSPACE |
880800-1001 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
880800-1001 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
880800-1001 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
881600-1001 | VALVE ASSY SOLENOID | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
881600-1001 | VALVE ASSY SOLENOID | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
881600-1001 | VALVE ASSY SOLENOID | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
881700-1001 | SOLENOID VALVE ASSEMBLY | OVERHAUL | 14 Days | EATON |
881700-1001 | SOLENOID VALVE ASSEMBLY | REPAIR | 5 Days | EATON |
881700-1001 | SOLENOID VALVE ASSEMBLY | TEST | 3 Days | EATON |
881800-1001 | VALVE ASSEMBLY SOLENOID DUAL C | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
881800-1001 | VALVE ASSEMBLY SOLENOID DUAL C | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
881800-1001 | VALVE ASSEMBLY SOLENOID DUAL C | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
883500-1001 | SOLENOID | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
883500-1001 | SOLENOID | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
9023B0003-01 | PRESSURE SWITCH | INSPECT | 3 Days | LIEBHERR |
9023B0004-01 | PRESSURE SWITCH | INSPECT | 3 Days | LIEBHERR |
9070A0008-01 | LVDT | INSPECT | 3 Days | LIEBHERR |
9070A0008-02 | LVDT | INSPECT | 3 Days | LIEBHERR |
9070A0008-03 | LVDT | INSPECT | 3 Days | LIEBHERR |
90G118-2 | PRESSURE SWITCH | INSPECT | 3 Days | CUSTOM COMPONENT SWITCH |
90G118-2 | PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM COMPONENT SWITCH |
90G118 | HYDRAULIC SWITCH ASSY | INSPECT | 3 Days | CUSTOM CONTROL SENSORS |
90G118 | HYDRAULIC SWITCH ASSY | REPAIR | 5 Days | CUSTOM CONTROL SENSORS |
90G191 | SWITCH ASSY | INSPECT | 3 Days | CUSTOM COMPONENT SWITCH |
90G191 | SWITCH ASSY | REPAIR | 5 Days | CUSTOM COMPONENT SWITCH |
90G237 | PRESSURE SWITCH | INSPECT | 3 Days | CUSTOM CONTROL SENSORS |
90G237 | PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM CONTROL SENSORS |
90G237 | PRESSURE SWITCH | OVERHAUL | 15 Days | CUSTOM CONTROL SENSORS |
90G97 | PRESSURE SWITCH | INSPECT | 3 Days | CUSTOM CONTROL SENSORS |
90G97 | PRESSURE SWITCH | REPAIR | 5 Days | CUSTOM CONTROL SENSORS |
90G97 | PRESSURE SWITCH | OVERHAUL | 15 Days | CUSTOM CONTROL SENSORS |
910344-16 | CLAMP HOSE | INSPECT | 3 Days | PARKER HANNIFIN AEROSPACE |
9123-8071 | RELAY | INSPECT | 3 Days | |
9123-8072 | RELAY | INSPECT | 3 Days | |
95-042-0-130 | SET OF COILS | INSPECT | 3 Days | MESSIER-BUGATTI |
95791-01 | FWD RIGHT ISOLATOR ASSEMBLY | OVERHAUL | 14 Days | BARRY CONTROLS |
95791-01 | FWD RIGHT ISOLATOR ASSEMBLY | REPAIR | 5 Days | BARRY CONTROLS |
95791-01 | FWD RIGHT ISOLATOR ASSEMBLY | TEST | 3 Days | BARRY CONTROLS |
95791-02 | FWD LEFT ISOLATOR ASSEMBLY | OVERHAUL | 14 Days | BARRY CONTROLS |
95791-02 | FWD LEFT ISOLATOR ASSEMBLY | REPAIR | 5 Days | BARRY CONTROLS |
95791-02 | FWD LEFT ISOLATOR ASSEMBLY | TEST | 3 Days | BARRY CONTROLS |
95791-03 | AFT APU ISOLATOR | OVERHAUL | 14 Days | BARRY CONTROLS |
95791-03 | AFT APU ISOLATOR | REPAIR | 5 Days | BARRY CONTROLS |
95791-03 | AFT APU ISOLATOR | TEST | 3 Days | BARRY CONTROLS |
972A6-1 | NON RETURN VALVE | OVERHAUL | 14 Days | INTERTECHNIQUE, INC |
972A6-1 | NON RETURN VALVE | REPAIR | 5 Days | INTERTECHNIQUE, INC |
972A6-1 | NON RETURN VALVE | TEST | 3 Days | INTERTECHNIQUE, INC |
A05000 | ACTUATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
A05000 | ACTUATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
A05000 | ACTUATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
A05B00 | ACTUATOR ASSY | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
A05B00 | ACTUATOR ASSY | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
A05B00 | ACTUATOR ASSY | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
A22582-1 | CONNECTOR, ELECTRICAL | INSPECT | 3 Days | MOOG |
A25312-1 | THROTTLE VALVE | OVERHAUL | 14 Days | MESSIER-BUGATTI |
A25312-1 | THROTTLE VALVE | REPAIR | 5 Days | MESSIER-BUGATTI |
A25312-1 | THROTTLE VALVE | TEST | 3 Days | MESSIER-BUGATTI |
A25312 | THROTTLE VALVE | OVERHAUL | 14 Days | MESSIER-BUGATTI |
A25312 | THROTTLE VALVE | REPAIR | 5 Days | MESSIER-BUGATTI |
A25312 | THROTTLE VALVE | TEST | 3 Days | MESSIER-BUGATTI |
A25313-1 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313-1 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313-1 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313-101 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313-101 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313-101 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313002-1 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313002-1 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313002-1 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313002-2 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313002-2 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313002-2 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313002 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313002 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313002 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313003-1 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313003-1 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313003-1 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313003-2 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313003-2 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313003-2 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A25313003 | BRAKE SELECTOR VALVE | OVERHAUL | 14 Days | SAFRAN |
A25313003 | BRAKE SELECTOR VALVE | REPAIR | 5 Days | SAFRAN |
A25313003 | BRAKE SELECTOR VALVE | TEST | 3 Days | SAFRAN |
A50455-3 | TRANSDUCER | INSPECT | 3 Days | MOOG |
A50455-4 | LVDT | INSPECT | 3 Days | MOOG |
A80291 | LINER | INSPECT | 3 Days | MESSIER-BUGATTI |
A80291 | LINER | REPAIR | 5 Days | MESSIER-BUGATTI |
A80519 | BODY | INSPECT | 3 Days | MESSIER-BUGATTI |
A80701 | BODY | INSPECT | 3 Days | MESSIER-BUGATTI |
A80710 | BODY | INSPECT | 3 Days | MESSIER-BUGATTI |
A80759 | LINER | INSPECT | 3 Days | MESSIER-BUGATTI |
A80759 | LINER | REPAIR | 5 Days | MESSIER-BUGATTI |
A81056 | PLUG | INSPECT | 3 Days | SAFRAN |
A88223-1 | BODY | INSPECT | 3 Days | SAFRAN |
A88223-2 | BODY | INSPECT | 3 Days | SAFRAN |
A88223-3 | BODY | INSPECT | 3 Days | SAFRAN |
A88223-4 | BODY | INSPECT | 3 Days | SAFRAN |
A88223-5 | BODY | INSPECT | 3 Days | SAFRAN |
A88223-6 | BODY | INSPECT | 3 Days | SAFRAN |
A88223-7 | BODY | INSPECT | 3 Days | SAFRAN |
A88223 | BODY | INSPECT | 3 Days | SAFRAN |
AA2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
AA2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
AA2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
AA2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
AA2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
AA2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
AB2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
AB2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
AB2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
ABS0121-30 | SENSOR PROXIMITY | TEST | 3 Days | CRANE |
ABS0121-31 | SENSOR PROXIMITY | INSPECT | 3 Days | CRANE |
ABS0121-40 | PROXIMITY SENSOR | TEST | 3 Days | CRANE |
AE86195G | VALVE ASSEMBLY | OVERHAUL | 14 Days | AEROQUIP INC. |
AE86195G | VALVE ASSEMBLY | REPAIR | 5 Days | AEROQUIP INC. |
AE86195G | VALVE ASSEMBLY | TEST | 3 Days | AEROQUIP INC. |
ALL400-700-0 | DOOR OPENING HYD ACTUATOR | TEST | 3 Days | GOODRICH |
ALL400-700-0 | DOOR OPENING HYD ACTUATOR | REPAIR | 7 Days | GOODRICH |
ALL400-700-0 | DOOR OPENING HYD ACTUATOR | OVERHAUL | 21 Days | GOODRICH |
ALL400-702-0 | DOOR OPENING HYD ACTUATOR | TEST | 3 Days | GOODRICH |
ALL400-702-0 | DOOR OPENING HYD ACTUATOR | REPAIR | 7 Days | GOODRICH |
ALL400-702-0 | DOOR OPENING HYD ACTUATOR | OVERHAUL | 21 Days | GOODRICH |
ASG7010-1 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
ASG7010-1 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
ASG7010-501 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
ASG7010-501 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
ASG7010-503 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
ASG7010-503 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
ASG7010-505 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
ASG7010-505 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
ASG7010-507 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
ASG7010-507 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
ASG7010-509 | HYDRAULIC PUMP ATTENUATOR | INSPECT | 3 Days | BOEING |
ASG7010-509 | HYDRAULIC PUMP ATTENUATOR | REPAIR | 5 Days | BOEING |
AV13J5100 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5100 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5100 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5101 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5101 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5101 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5102 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5102 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5102 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5105 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5105 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5105 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5144 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5144 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5144 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5145 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5145 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5145 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5146 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5146 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5146 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5147 | VALVE ASSY MOTOR OPERATED | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5147 | VALVE ASSY MOTOR OPERATED | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5147 | VALVE ASSY MOTOR OPERATED | TEST | 3 Days | ITT AEROSPACE CONTROLS |
AV13J5156 | MOTOR OPERATED VALVE | OVERHAUL | 14 Days | ITT AEROSPACE CONTROLS |
AV13J5156 | MOTOR OPERATED VALVE | REPAIR | 5 Days | ITT AEROSPACE CONTROLS |
AV13J5156 | MOTOR OPERATED VALVE | TEST | 3 Days | ITT AEROSPACE CONTROLS |
B43701-002 | LINEAR TRANSDUCER | INSPECT | 3 Days | MOOG |
B43701-003 | LINEAR TRANSDUCER | INSPECT | 3 Days | MOOG |
B43701-004 | LINEAR TRANSDUCER | INSPECT | 3 Days | MOOG |
B458Z02-00 | RVDT | INSPECT | 3 Days | |
B87861-5 | TRANSDUCER | INSPECT | 3 Days | |
B87861-6 | LVDT | INSPECT | 3 Days | |
B93492-5 | TRANSDUCER | INSPECT | 3 Days | MOOG |
B93492-6 | LVDT | INSPECT | 3 Days | MOOG |
B94760-005 | RVDT | INSPECT | 3 Days | MOOG |
BFH171212P1V | ELECTRICAL CONNECTOR | INSPECT | 3 Days | ARKWIN |
BFH171212P1V06-Y70 | CONNECTOR | INSPECT | 3 Days | ARKWIN |
BHC1060-03 | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
BHC1060-03 | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
BHC1060-03 | HYDRAULIC CONTROL UNIT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
BHC1060-04 | PRIORITY VALVE | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
BHC1060-04 | PRIORITY VALVE | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
BHC1060-04 | PRIORITY VALVE | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
C20103500 | BRAKE SERVOVALVE | OVERHAUL | 14 Days | SAFRAN |
C20103500 | BRAKE SERVOVALVE | REPAIR | 5 Days | SAFRAN |
C20103500 | BRAKE SERVOVALVE | TEST | 3 Days | SAFRAN |
C20103520 | BRAKE SERVOVALVE | OVERHAUL | 14 Days | SAFRAN |
C20103520 | BRAKE SERVOVALVE | REPAIR | 5 Days | SAFRAN |
C20103520 | BRAKE SERVOVALVE | TEST | 3 Days | SAFRAN |
C20288000-1 | ACCUMULATOR | OVERHAUL | 14 Days | SAFRAN |
C20288000-1 | ACCUMULATOR | REPAIR | 5 Days | SAFRAN |
C20288000-1 | ACCUMULATOR | TEST | 3 Days | SAFRAN |
C20288000-2 | ACCUMULATOR | OVERHAUL | 14 Days | SAFRAN |
C20288000-2 | ACCUMULATOR | REPAIR | 5 Days | SAFRAN |
C20288000-2 | ACCUMULATOR | TEST | 3 Days | SAFRAN |
C20374000-1 | BRAKE SERVO VALVE | OVERHAUL | 14 Days | SAFRAN |
C20374000-1 | BRAKE SERVO VALVE | REPAIR | 5 Days | SAFRAN |
C20374000-1 | BRAKE SERVO VALVE | TEST | 3 Days | SAFRAN |
C20374000-2 | BRAKE SERVO VALVE | OVERHAUL | 14 Days | SAFRAN |
C20374000-2 | BRAKE SERVO VALVE | REPAIR | 5 Days | SAFRAN |
C20374000-2 | BRAKE SERVO VALVE | TEST | 3 Days | SAFRAN |
C20663-001 | LVDT | INSPECT | 3 Days | MOOG |
C24592000-1 | MASTER CYLINDER | OVERHAUL | 14 Days | SAFRAN |
C24592000-1 | MASTER CYLINDER | REPAIR | 5 Days | SAFRAN |
C24592000-1 | MASTER CYLINDER | TEST | 3 Days | SAFRAN |
C24592000 | MASTER CYLINDER | OVERHAUL | 14 Days | SAFRAN |
C24592000 | MASTER CYLINDER | REPAIR | 5 Days | SAFRAN |
C24592000 | MASTER CYLINDER | TEST | 3 Days | SAFRAN |
C24737002-4 | MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24737002-4 | MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24737002-4 | MANIFOLD | TEST | 3 Days | SAFRAN |
C24737002 | BRAKE MANIFOLD | OVERHAUL | 14 Days | |
C24737002 | BRAKE MANIFOLD | REPAIR | 5 Days | |
C24737002 | BRAKE MANIFOLD | TEST | 3 Days | |
C24747000-1 | SWIVELSELECTOR VALVE | OVERHAUL | 14 Days | MESSIER-BUGATTI |
C24747000-1 | SWIVELSELECTOR VALVE | REPAIR | 5 Days | MESSIER-BUGATTI |
C24747000-1 | SWIVELSELECTOR VALVE | TEST | 3 Days | MESSIER-BUGATTI |
C24747000 | SWIVEL SELECTOR VALVE | OVERHAUL | 14 Days | MESSIER-BUGATTI |
C24747000 | SWIVEL SELECTOR VALVE | REPAIR | 5 Days | MESSIER-BUGATTI |
C24747000 | SWIVEL SELECTOR VALVE | TEST | 3 Days | MESSIER-BUGATTI |
C24757000 | SAFETY VALVE | OVERHAUL | 14 Days | MESSIER-BUGATTI |
C24757000 | SAFETY VALVE | REPAIR | 5 Days | MESSIER-BUGATTI |
C24757000 | SAFETY VALVE | TEST | 3 Days | MESSIER-BUGATTI |
C24757020 | SAFETY VALVE | OVERHAUL | 14 Days | SAFRAN |
C24757020 | SAFETY VALVE | REPAIR | 5 Days | SAFRAN |
C24757020 | SAFETY VALVE | TEST | 3 Days | SAFRAN |
C24763000 | SENSOR BOX | OVERHAUL | 14 Days | SAFRAN |
C24763000 | SENSOR BOX | REPAIR | 5 Days | SAFRAN |
C24763000 | SENSOR BOX | TEST | 3 Days | SAFRAN |
C24777020-1 | NORMAL BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24777020-1 | NORMAL BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24777020-1 | NORMAL BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24777020-2 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24777020-2 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24777020-2 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C24777020-3 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24777020-3 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24777020-3 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C247779020 | NORMAL BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C247779020 | NORMAL BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C247779020 | NORMAL BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24828000 | PRESSURE SWITCH | OVERHAUL | 14 Days | MESSIER-BUGATTI |
C24828000 | PRESSURE SWITCH | REPAIR | 5 Days | MESSIER-BUGATTI |
C24828000 | PRESSURE SWITCH | TEST | 3 Days | MESSIER-BUGATTI |
C24837101-1 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24837101-1 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24837101-1 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C24837101-2 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24837101-2 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24837101-2 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C24837101-3 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24837101-3 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24837101-3 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C24837101-4 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24837101-4 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24837101-4 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C24837101 | NORMAL BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24837101 | NORMAL BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24837101 | NORMAL BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24837102-2 | NORMAL BRAKE MANIFOLD ASSY | OVERHAUL | 14 Days | SAFRAN |
C24837102-2 | NORMAL BRAKE MANIFOLD ASSY | REPAIR | 5 Days | SAFRAN |
C24837102-2 | NORMAL BRAKE MANIFOLD ASSY | TEST | 3 Days | SAFRAN |
C24837102 | NORMAL BRAKE MANIFOLD ASSEMBL | OVERHAUL | 14 Days | SAFRAN |
C24837102 | NORMAL BRAKE MANIFOLD ASSEMBL | REPAIR | 5 Days | SAFRAN |
C24837102 | NORMAL BRAKE MANIFOLD ASSEMBL | TEST | 3 Days | SAFRAN |
C24839010-1 | ALTERNATE BRAKE MANIFOLD ASSE | OVERHAUL | 14 Days | SAFRAN |
C24839010-1 | ALTERNATE BRAKE MANIFOLD ASSE | REPAIR | 5 Days | SAFRAN |
C24839010-1 | ALTERNATE BRAKE MANIFOLD ASSE | TEST | 3 Days | SAFRAN |
C24839010-100 | LH/RH ALTERNATE BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24839010-100 | LH/RH ALTERNATE BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24839010-100 | LH/RH ALTERNATE BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24839010-1000 | LH/RH ALTERNATE BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24839010-1000 | LH/RH ALTERNATE BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24839010-1000 | LH/RH ALTERNATE BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24839010-2 | ALTERNATE BRAKE MANIFOLD ASSE | OVERHAUL | 14 Days | SAFRAN |
C24839010-2 | ALTERNATE BRAKE MANIFOLD ASSE | REPAIR | 5 Days | SAFRAN |
C24839010-2 | ALTERNATE BRAKE MANIFOLD ASSE | TEST | 3 Days | SAFRAN |
C24839010-2000 | LH/RH ALTERNATE BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24839010-2000 | LH/RH ALTERNATE BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24839010-2000 | LH/RH ALTERNATE BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24839010 | ALTERNATE BRAKE MANIFOLD ASSE | OVERHAUL | 14 Days | SAFRAN |
C24839010 | ALTERNATE BRAKE MANIFOLD ASSE | REPAIR | 5 Days | SAFRAN |
C24839010 | ALTERNATE BRAKE MANIFOLD ASSE | TEST | 3 Days | SAFRAN |
C24840010-1 | ALTERNATE MANIFOLD ASSEMBLY (R | OVERHAUL | 14 Days | SAFRAN |
C24840010-1 | ALTERNATE MANIFOLD ASSEMBLY (R | REPAIR | 5 Days | SAFRAN |
C24840010-1 | ALTERNATE MANIFOLD ASSEMBLY (R | TEST | 3 Days | SAFRAN |
C24840010-100 | LH/RH ALTERNATE BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24840010-100 | LH/RH ALTERNATE BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24840010-100 | LH/RH ALTERNATE BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24840010-1000 | LH/RH ALTERNATE BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24840010-1000 | LH/RH ALTERNATE BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24840010-1000 | LH/RH ALTERNATE BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24840010-2 | ALTERNATE MANIFOLD ASSEMBLY (R | OVERHAUL | 14 Days | SAFRAN |
C24840010-2 | ALTERNATE MANIFOLD ASSEMBLY (R | REPAIR | 5 Days | SAFRAN |
C24840010-2 | ALTERNATE MANIFOLD ASSEMBLY (R | TEST | 3 Days | SAFRAN |
C24840010-2000 | LH/RH ALTERNATE BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24840010-2000 | LH/RH ALTERNATE BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24840010-2000 | LH/RH ALTERNATE BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24840010 | ALTERNATE MANIFOLD ASSEMBLY (R | OVERHAUL | 14 Days | SAFRAN |
C24840010 | ALTERNATE MANIFOLD ASSEMBLY (R | REPAIR | 5 Days | SAFRAN |
C24840010 | ALTERNATE MANIFOLD ASSEMBLY (R | TEST | 3 Days | SAFRAN |
C24879020-2 | LH ALT BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24879020-2 | LH ALT BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24879020-2 | LH ALT BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24879020-3 | BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24879020-3 | BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24879020-3 | BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24880020-2 | RH ALT BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24880020-2 | RH ALT BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24880020-2 | RH ALT BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C24880020-3 | BRAKE MANIFOLD | OVERHAUL | 14 Days | SAFRAN |
C24880020-3 | BRAKE MANIFOLD | REPAIR | 5 Days | SAFRAN |
C24880020-3 | BRAKE MANIFOLD | TEST | 3 Days | SAFRAN |
C25243002-1 | SAFETY VALVE | OVERHAUL | 14 Days | SAFRAN |
C25243002-1 | SAFETY VALVE | REPAIR | 5 Days | SAFRAN |
C25243002-1 | SAFETY VALVE | TEST | 3 Days | SAFRAN |
C25243002-2 | SAFETY VALVE | OVERHAUL | 14 Days | SAFRAN |
C25243002-2 | SAFETY VALVE | REPAIR | 5 Days | SAFRAN |
C25243002-2 | SAFETY VALVE | TEST | 3 Days | SAFRAN |
C25243002 | SAFETY VALVE | OVERHAUL | 14 Days | SAFRAN |
C25243002 | SAFETY VALVE | REPAIR | 5 Days | SAFRAN |
C25243002 | SAFETY VALVE | TEST | 3 Days | SAFRAN |
C25243102 | SAFETY VALVE | OVERHAUL | 14 Days | |
C25243102 | SAFETY VALVE | REPAIR | 5 Days | |
C25243102 | SAFETY VALVE | TEST | 3 Days | |
C29055-001 | MODE SELECTOR VALVE | INSPECT | 3 Days | MOOG |
C29055-002 | MODESELECTOR VALVE | INSPECT | 3 Days | MOOG |
C29055-003 | MODE SELECTOR VALVE | INSPECT | 3 Days | MOOG |
C29055-004 | MODE SELECTOR VALVE | INSPECT | 3 Days | MOOG |
C29055-005 | MODE SELECTOR VALVE | INSPECT | 3 Days | MOOG |
C48902-001 | SENSOR ASSEMBLY | OVERHAUL | 14 Days | MOOG |
C48902-001 | SENSOR ASSEMBLY | REPAIR | 5 Days | MOOG |
C48902-001 | SENSOR ASSEMBLY | TEST | 3 Days | MOOG |
C48902-002 | SENSOR ASSEMBLY | OVERHAUL | 14 Days | MOOG |
C48902-002 | SENSOR ASSEMBLY | REPAIR | 5 Days | MOOG |
C48902-002 | SENSOR ASSEMBLY | TEST | 3 Days | MOOG |
C51LM0011-014 | HOUSING LOWER | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
C82LL0010 | DRAIN VALVE | OVERHAUL | 14 Days | GOODRICH |
C82LL0010 | DRAIN VALVE | REPAIR | 5 Days | GOODRICH |
C82LL0010 | DRAIN VALVE | TEST | 3 Days | GOODRICH |
CA83239-001 | LINEAR TRANSDUCER | INSPECT | 3 Days | MOOG |
CH1878A1039 | RETAINER ASSY AND BEARING | INSPECT | 3 Days | GOODRICH |
CH1878A1064 | RETAINER ASSY AND BEARING | INSPECT | 3 Days | GOODRICH |
CH250357 | TRANSDUCER | INSPECT | 3 Days | GOODRICH |
CH250504 | CONTACTOR-PRESSURE | OVERHAUL | 14 Days | GOODRICH |
CH250504 | CONTACTOR-PRESSURE | REPAIR | 5 Days | GOODRICH |
CH250504 | CONTACTOR-PRESSURE | TEST | 3 Days | GOODRICH |
CH250882 | SOLENOID | INSPECT | 3 Days | GOODRICH |
CH250927 | SOLENOID | INSPECT | 3 Days | GOODRICH |
CZ9284E | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
CZ9DM6A | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
D05000 | FILL DRAIN VALVE | OVERHAUL | 14 Days | SITEC AEROSPACE |
D05000 | FILL DRAIN VALVE | REPAIR | 5 Days | SITEC AEROSPACE |
D05000 | FILL DRAIN VALVE | TEST | 3 Days | SITEC AEROSPACE |
D05A00 | FILL AND DRAIN VALVE | OVERHAUL | 14 Days | SITEC AEROSPACE |
D05A00 | FILL AND DRAIN VALVE | REPAIR | 5 Days | SITEC AEROSPACE |
D05A00 | FILL AND DRAIN VALVE | TEST | 3 Days | SITEC AEROSPACE |
D05B00 | FILL AND DRAIN VALVE | OVERHAUL | 14 Days | SITEC AEROSPACE |
D05B00 | FILL AND DRAIN VALVE | REPAIR | 5 Days | SITEC AEROSPACE |
D05B00 | FILL AND DRAIN VALVE | TEST | 3 Days | SITEC AEROSPACE |
D05C00 | FILL AND DRAIN VALVE | OVERHAUL | 14 Days | SITEC AEROSPACE |
D05C00 | FILL AND DRAIN VALVE | REPAIR | 5 Days | SITEC AEROSPACE |
D05C00 | FILL AND DRAIN VALVE | TEST | 3 Days | SITEC AEROSPACE |
D370309 | LINEAR TRANSDUCER | INSPECT | 3 Days | GOODRICH |
D90ST5006-0019 | NO-BACK HOUSING | INSPECT | 3 Days | COLLINS AEROSPACE |
E2-6000700 | SOLENOID | INSPECT | 3 Days | LIEBHERR |
E21326000-1 | BRAKE SERVO VALVE | OVERHAUL | 14 Days | SAFRAN |
E21326000-1 | BRAKE SERVO VALVE | REPAIR | 5 Days | SAFRAN |
E21326000-1 | BRAKE SERVO VALVE | TEST | 3 Days | SAFRAN |
E21326000-2 | BRAKE SERVO VALVE | OVERHAUL | 14 Days | SAFRAN |
E21326000-2 | BRAKE SERVO VALVE | REPAIR | 5 Days | SAFRAN |
E21326000-2 | BRAKE SERVO VALVE | TEST | 3 Days | SAFRAN |
E21326000 | BRAKE SERVO VALVE | OVERHAUL | 14 Days | SAFRAN |
E21326000 | BRAKE SERVO VALVE | REPAIR | 5 Days | SAFRAN |
E21326000 | BRAKE SERVO VALVE | TEST | 3 Days | SAFRAN |
E3-6000770 | SWITCH PROXIMITY | INSPECT | 3 Days | LIEBHERR |
E3-6000771 | SWITCH PROXIMITY | INSPECT | 3 Days | LIEBHERR |
E3-6000810 | SOLENOID | INSPECT | 3 Days | LIEBHERR |
EM91-79-1 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-79-1 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-79-1 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-79-3 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-79-3 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-79-3 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-79-4 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-79-4 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-79-4 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-79-5 | SHUTOFF BALL VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-79-5 | SHUTOFF BALL VALVE | REPAIR | 5 Days | CIRCOR |
EM91-79-5 | SHUTOFF BALL VALVE | TEST | 3 Days | CIRCOR |
EM91-79 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-79 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-79 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-80-1 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-80-1 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-80-1 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-80-3 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-80-3 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-80-3 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-80-4 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-80-4 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-80-4 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-80-5 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-80-5 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-80-5 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EM91-80 | SHUTOFF VALVE | OVERHAUL | 14 Days | CIRCOR |
EM91-80 | SHUTOFF VALVE | REPAIR | 5 Days | CIRCOR |
EM91-80 | SHUTOFF VALVE | TEST | 3 Days | CIRCOR |
EVP-606-2 | SOLENOID VALVE | INSPECT | 3 Days | UTC AEROSPACE SYSTEMS |
EVP204-3 | SOLENOID VALVE | INSPECT | 3 Days | COLLINS AEROSPACE |
EVP504 | ELECTROVALVE | OVERHAUL | 14 Days | GOODRICH |
EVP504 | ELECTROVALVE | REPAIR | 5 Days | GOODRICH |
EVP504 | ELECTROVALVE | TEST | 3 Days | GOODRICH |
EVP504B | SELECTOR VALVE | OVERHAUL | 14 Days | GOODRICH |
EVP504B | SELECTOR VALVE | REPAIR | 5 Days | GOODRICH |
EVP504B | SELECTOR VALVE | TEST | 3 Days | GOODRICH |
EVP504C | SELECTOR VALVE | OVERHAUL | 14 Days | GOODRICH |
EVP504C | SELECTOR VALVE | REPAIR | 5 Days | GOODRICH |
EVP504C | SELECTOR VALVE | TEST | 3 Days | GOODRICH |
EVP604 | SOLENOID VALVE | INSPECT | 3 Days | GOODRICH |
EVP606 | SOLENOID VALVE | OVERHAUL | 14 Days | GOODRICH |
EVP606 | SOLENOID VALVE | REPAIR | 5 Days | GOODRICH |
EVP606 | SOLENOID VALVE | TEST | 3 Days | GOODRICH |
EVT174-2-05-100 | SHROUD GRID SUPPORT ASSY | OVERHAUL | 14 Days | TECHNOFAN SNECMA GROUP |
EVT174-2-05-100 | SHROUD GRID SUPPORT ASSY | REPAIR | 5 Days | TECHNOFAN SNECMA GROUP |
EVT174-2-05-100 | SHROUD GRID SUPPORT ASSY | TEST | 3 Days | TECHNOFAN SNECMA GROUP |
EVT174-2-05-200 | SHROUD GRID SUPPORT ASSY | OVERHAUL | 14 Days | TECHNOFAN SNECMA GROUP |
EVT174-2-05-200 | SHROUD GRID SUPPORT ASSY | REPAIR | 5 Days | TECHNOFAN SNECMA GROUP |
EVT174-2-05-200 | SHROUD GRID SUPPORT ASSY | TEST | 3 Days | TECHNOFAN SNECMA GROUP |
FE151-000-01 | NO-BACK HOUSING | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-01RA0 | NO-BACK HOUSING | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-31 | PRIMARY PIN | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-32 | SECONDARY PIN | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-34-01 | SPACER | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-34-02 | SPACER | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-34 | SPACER | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-35 | SPACER | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-36 | STOP PLATE | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-37 | PRIMARY NUT | INSPECT | 3 Days | COLLINS AEROSPACE |
FE151-000-38 | SECONDARY NUT | INSPECT | 3 Days | COLLINS AEROSPACE |
G2109-0061 | MOTOR ASSY | INSPECT | 3 Days | CIRCOR |
GA71176-1 | ACTUATOR ASSEMBLY | OVERHAUL | 14 Days | SAFRAN |
GA71176-1 | ACTUATOR ASSEMBLY | REPAIR | 5 Days | SAFRAN |
GA71176-1 | ACTUATOR ASSEMBLY | TEST | 3 Days | SAFRAN |
GA71176-2 | ACTUATOR | OVERHAUL | 14 Days | SAFRAN |
GA71176-2 | ACTUATOR | REPAIR | 5 Days | SAFRAN |
GA71176-2 | ACTUATOR | TEST | 3 Days | SAFRAN |
GA71176 | ACTUATOR ASSEMBLY | OVERHAUL | 14 Days | COLLINS AEROSPACE |
GA71176 | ACTUATOR ASSEMBLY | REPAIR | 5 Days | COLLINS AEROSPACE |
GA71176 | ACTUATOR ASSEMBLY | TEST | 3 Days | COLLINS AEROSPACE |
GM1032-25 | TRANSDUCER | INSPECT | 3 Days | KAVLICO |
GM5341-4 | FORCE TRANSDUCER | OVERHAUL | 14 Days | KAVLICO |
GM5341-4 | FORCE TRANSDUCER | REPAIR | 5 Days | KAVLICO |
GM5341-4 | FORCE TRANSDUCER | TEST | 3 Days | KAVLICO |
GM5341-5 | FORCE TRANSDUCER | OVERHAUL | 14 Days | KAVLICO |
GM5341-5 | FORCE TRANSDUCER | REPAIR | 5 Days | KAVLICO |
GM5341-5 | FORCE TRANSDUCER | TEST | 3 Days | KAVLICO |
GM5341-7 | TRANSDUCER | OVERHAUL | 14 Days | KAVLICO |
GM5341-7 | TRANSDUCER | REPAIR | 5 Days | KAVLICO |
GM5341-7 | TRANSDUCER | TEST | 3 Days | KAVLICO |
GM5341-8 | FORCE TRANSDUCER | OVERHAUL | 14 Days | KAVLICO |
GM5341-8 | FORCE TRANSDUCER | REPAIR | 5 Days | KAVLICO |
GM5341-8 | FORCE TRANSDUCER | TEST | 3 Days | KAVLICO |
GM6835-101 | TRANSDUCER ASSY | INSPECT | 3 Days | KAVLICO |
GM6850 | LVDT | INSPECT | 3 Days | BOEING |
GM6880 | LINEAR TRANDUCER | INSPECT | 3 Days | NABTESCO |
GM6937-2 | RVDT | INSPECT | 3 Days | MOOG |
GM6937-3 | RVDT | INSPECT | 3 Days | MOOG |
GM6937-4 | RVDT | INSPECT | 3 Days | MOOG |
GM6937-5 | RVDT | INSPECT | 3 Days | KAVLICO |
GM6958-101 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7086 | LVDT | INSPECT | 3 Days | MOOG |
GM7184-1 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7184-2 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7184-3 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7184-4 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7184-5 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7184-6 | LVDT | INSPECT | 3 Days | KAVLICO |
GM7753-3 | LVDT DUAL | INSPECT | 3 Days | GE AVIATION |
GM8375-4 | TRANSDUCER | INSPECT | 3 Days | MOOG |
GM8468-1 | LVDT | INSPECT | 3 Days | KAVLICO |
GM8468-2 | LVDT | INSPECT | 3 Days | KAVLICO |
GM8653 | LVDT | INSPECT | 3 Days | NABTESCO |
H20-1 | SWITCH | INSPECT | 3 Days | GENERAL ELECTRIC AVIATION |
H20-24B | SWITCH | INSPECT | 3 Days | GENERAL ELECTRIC AVIATION |
HP1373100-1 | RESERVOIR FILL VALVE | OVERHAUL | 14 Days | TACTAIR FLUID CONTROL INC. |
HP1373100-1 | RESERVOIR FILL VALVE | REPAIR | 5 Days | TACTAIR FLUID CONTROL INC. |
HP1373100-1 | RESERVOIR FILL VALVE | TEST | 3 Days | TACTAIR FLUID CONTROL INC. |
HP1373100-3 | RESERVOIR FILL VALVE | OVERHAUL | 14 Days | TACTAIR FLUID CONTROL INC. |
HP1373100-3 | RESERVOIR FILL VALVE | REPAIR | 5 Days | TACTAIR FLUID CONTROL INC. |
HP1373100-3 | RESERVOIR FILL VALVE | TEST | 3 Days | TACTAIR FLUID CONTROL INC. |
HTE2501 | MOTOR | INSPECT | 3 Days | EATON |
HTE2501A | MOTOR | INSPECT | 3 Days | EATON |
HTE690035-1 | SWITCH-PRESSURE | INSPECT | 3 Days | FR-HITEMP |
HTE690035 | PRESSURE SWITCH | INSPECT | 3 Days | FR-HITEMP |
IBA103G-93 | BRAKE PRESSURE TRANSDUCER | INSPECT | 3 Days | BOEING |
L2912 | LVDT | INSPECT | 3 Days | BOEING |
MVT100-1 | SELECTOR VALVE | INSPECT | 3 Days | COLLINS AEROSPACE |
MVT100-2 | SELECTOR VALVE | INSPECT | 3 Days | COLLINS AEROSPACE |
MVT200 | SELECTOR VALVE | INSPECT | 3 Days | COLLINS AEROSPACE |
P2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
P2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
P2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
P2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
P2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
P2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
P665A0001-00 | SPOILER ACTUATOR | OVERHAUL | 14 Days | MOOG |
P665A0001-00 | SPOILER ACTUATOR | REPAIR | 5 Days | MOOG |
P665A0001-00 | SPOILER ACTUATOR | TEST | 3 Days | MOOG |
P665A0001-01 | SPOILER ACTUATOR | OVERHAUL | 14 Days | MOOG |
P665A0001-01 | SPOILER ACTUATOR | REPAIR | 5 Days | MOOG |
P665A0001-01 | SPOILER ACTUATOR | TEST | 3 Days | MOOG |
P665A0001-02 | SPOILER ACTUATOR POWER CONTR | OVERHAUL | 14 Days | MOOG |
P665A0001-02 | SPOILER ACTUATOR POWER CONTR | REPAIR | 5 Days | MOOG |
P665A0001-02 | SPOILER ACTUATOR POWER CONTR | TEST | 3 Days | MOOG |
P665A0001-03 | SPOILER ACTUATOR | OVERHAUL | 14 Days | MOOG |
P665A0001-03 | SPOILER ACTUATOR | REPAIR | 5 Days | MOOG |
P665A0001-03 | SPOILER ACTUATOR | TEST | 3 Days | MOOG |
P665A0119-00 | CHECK VALVE ASSEMBLY | INSPECT | 2 Days | MOOG |
P665A0135-00 | SOLENOID VALVE | INSPECT | 3 Days | MOOG |
P7119HP | SAMPLING VALVE | OVERHAUL | 14 Days | SOFRANCE |
P7119HP | SAMPLING VALVE | REPAIR | 5 Days | SOFRANCE |
P7119HP | SAMPLING VALVE | TEST | 3 Days | SOFRANCE |
PS102 | PRESSURE SWITCH | INSPECT | 3 Days | COLLINS AEROSPACE |
PTX300-8009-1 | PRESSURE TRANSDUCER | INSPECT | 3 Days | GE SENSING |
PTX300-8009-2 | PRESSURE TRASDUCER | INSPECT | 3 Days | GE SENSING |
PTX300-8009-3 | PRESSURE TRANSDUCER | INSPECT | 3 Days | GE SENSING |
RC697UK07R | INDICATOR-120 PSID | INSPECT | 3 Days | |
RC697UK07R | INDICATOR-120 PSID | REPAIR | 5 Days | |
RVT100-1 | ROTARY TRANSDUCER | INSPECT | 3 Days | GOODRICH |
RVT100 | ROTARY TRANSDUCER | INSPECT | 3 Days | GOODRICH |
S1544125-1 | RODEND ASSY | INSPECT | 3 Days | NABTESCO |
S1544125-1 | RODEND ASSY | REPAIR | 5 Days | NABTESCO |
S1544125-11 | RODEND | INSPECT | 3 Days | NABTESCO |
S1544125-11 | RODEND | REPAIR | 5 Days | NABTESCO |
S1544235-5 | LVDT MAIN RAM | INSPECT | 3 Days | NABTESCO |
S1544335-7 | LVDT MAIN RAM | INSPECT | 3 Days | |
S251N123-1 | LVDT | INSPECT | 3 Days | KAVLICO |
S251N123-2 | LVDT | INSPECT | 3 Days | KAVLICO |
S251N222-1 | ROTARY VARIABLE DIFFERENTIAL TR | INSPECT | 3 Days | MPC PRODUCTS |
S251N222-2 | ROTARY VARIABLE DIFFERENTIAL TR | INSPECT | 3 Days | MPC PRODUCTS |
S252T003-1 | TRANSDUCER ASSY | INSPECT | 3 Days | BOEING |
S252T003-2 | LVDT | INSPECT | 3 Days | TEIJIN SEIKI |
S252T003-3 | TRANSDUCER | INSPECT | 3 Days | |
S252T003-4 | TRANSDUCER | INSPECT | 3 Days | |
S252T003-6 | TRANSDUCER | INSPECT | 3 Days | |
S252T701-4 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S252T701-4 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S252T701-4 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S252T701-6 | RUDDER PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S252T701-6 | RUDDER PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S252T701-6 | RUDDER PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S252T801-3 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S252T801-3 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S252T801-3 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S252T801-4 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S252T801-4 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S252T801-4 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S252T801-5 | ELEVATOR PCA | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S252T801-5 | ELEVATOR PCA | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S252T801-5 | ELEVATOR PCA | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S256A225-1 | LE SLAT ACTUATOR | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S256A225-1 | LE SLAT ACTUATOR | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S256A225-1 | LE SLAT ACTUATOR | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S270T010-11 | SHUTOFF BALL VALVE | OVERHAUL | 14 Days | CIRCOR |
S270T010-11 | SHUTOFF BALL VALVE | REPAIR | 5 Days | CIRCOR |
S270T010-11 | SHUTOFF BALL VALVE | TEST | 3 Days | CIRCOR |
S270T010-14 | SHUTOFF BALL VALVE | OVERHAUL | 14 Days | CIRCOR |
S270T010-14 | SHUTOFF BALL VALVE | REPAIR | 5 Days | CIRCOR |
S270T010-14 | SHUTOFF BALL VALVE | TEST | 3 Days | CIRCOR |
S270T010-2 | SHUTOFF BALL VALVE | OVERHAUL | 14 Days | CIRCOR |
S270T010-2 | SHUTOFF BALL VALVE | REPAIR | 5 Days | CIRCOR |
S270T010-2 | SHUTOFF BALL VALVE | TEST | 3 Days | CIRCOR |
S270T010-5 | SHUTOFF BALL VALVE | OVERHAUL | 14 Days | CIRCOR |
S270T010-5 | SHUTOFF BALL VALVE | REPAIR | 5 Days | CIRCOR |
S270T010-5 | SHUTOFF BALL VALVE | TEST | 3 Days | CIRCOR |
S270T010-8 | SHUTOFF BALL VALVE | OVERHAUL | 14 Days | CIRCOR |
S270T010-8 | SHUTOFF BALL VALVE | REPAIR | 5 Days | CIRCOR |
S270T010-8 | SHUTOFF BALL VALVE | TEST | 3 Days | CIRCOR |
S270T242-5 | CARTRIDGE CHECK VALVE | OVERHAUL | 14 Days | PARKER HANNIFIN AEROSPACE |
S270T242-5 | CARTRIDGE CHECK VALVE | REPAIR | 5 Days | PARKER HANNIFIN AEROSPACE |
S270T242-5 | CARTRIDGE CHECK VALVE | TEST | 3 Days | PARKER HANNIFIN AEROSPACE |
S271N501-3 | MOTOR ACTUATOR | OVERHAUL | 14 Days | |
S271N501-3 | MOTOR ACTUATOR | REPAIR | 5 Days | |
S271N501-3 | MOTOR ACTUATOR | TEST | 3 Days | |
S271T005-2 | INDICATOR-DIFF PRESSURE HYDR | INSPECT | 3 Days | BOEING |
S271T005-3 | INDICATOR PRESSURE DROP | INSPECT | 3 Days | |
S271T005-4 | INDICATOR PRESSURE DROP | INSPECT | 3 Days | BOEING |
S271T005-5 | INDICATOR-DIFF PRESSURE HYDR | INSPECT | 3 Days | |
S271T451-1 | PRESSURE TRANSMITTER | OVERHAUL | 14 Days | |
S271T451-1 | PRESSURE TRANSMITTER | REPAIR | 5 Days | |
S271T451-1 | PRESSURE TRANSMITTER | TEST | 3 Days | |
S271T451-3 | PRESSURE TRANSMITTER | OVERHAUL | 14 Days | |
S271T451-3 | PRESSURE TRANSMITTER | REPAIR | 5 Days | |
S271T451-3 | PRESSURE TRANSMITTER | TEST | 3 Days | |
S271T452-15 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
S271T452-15 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
S271T452-18 | HYDRAULIC PRESSURE SWITCH | INSPECT | 3 Days | EATON |
S271T452-18 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
S271T452-3 | HYDRAULIC PRESSURE SWITCH | TEST | 3 Days | EATON |
S271T452-3 | HYDRAULIC PRESSURE SWITCH | REPAIR | 5 Days | EATON |
S271W731-1 | PRESSURE TRANSDUCER | INSPECT | 3 Days | GE SENSING |
S271W731-2 | PRESSURE TRANSDUCER | INSPECT | 3 Days | GE SENSING |
S271W731-3 | PRESSURE TRANSDUCER | INSPECT | 3 Days | GE SENSING |
S272U860-7 | FLOW RATE FUSE ASSEMBLY | OVERHAUL | 14 Days | TRIUMPH AVIATION SVCS ASIA |
S272U860-7 | FLOW RATE FUSE ASSEMBLY | REPAIR | 5 Days | TRIUMPH AVIATION SVCS ASIA |
S272U860-7 | FLOW RATE FUSE ASSEMBLY | TEST | 3 Days | TRIUMPH AVIATION SVCS ASIA |
S273N101-3 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-3 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-3 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-4 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-4 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-4 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-5 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-5 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-5 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-6 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-6 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-6 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-7 | NOSE LANDING GEAR DOOR ACTUAT | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-7 | NOSE LANDING GEAR DOOR ACTUAT | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S273N101-7 | NOSE LANDING GEAR DOOR ACTUAT | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-1 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-1 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-1 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-11 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-11 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-11 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-12 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-12 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-12 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-13 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-13 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-13 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-15 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-15 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-15 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-16 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-16 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-16 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-2 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-2 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-2 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-3 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-3 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-3 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-5 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-5 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-5 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-6 | QUANTITY MEASURING FUSE ASSEM | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-6 | QUANTITY MEASURING FUSE ASSEM | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S274A100-6 | QUANTITY MEASURING FUSE ASSEM | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S274T401-1 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
S274T401-1 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
S274T401-1 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
S274T401-2 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
S274T401-2 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
S274T401-2 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
S274T401-3 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
S274T401-3 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
S274T401-3 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
S274T401-4 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
S274T401-4 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
S274T401-4 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
S274T401-5 | AUTOBRAKE ASSEMBLY VALVE MODU | OVERHAUL | 14 Days | WOODWARD |
S274T401-5 | AUTOBRAKE ASSEMBLY VALVE MODU | REPAIR | 5 Days | WOODWARD |
S274T401-5 | AUTOBRAKE ASSEMBLY VALVE MODU | TEST | 3 Days | WOODWARD |
S283A305-2 | ANTICOLLISION FUSELAGE STROBE LI | OVERHAUL | 14 Days | HONEYWELL |
S283A305-2 | ANTICOLLISION FUSELAGE STROBE LI | REPAIR | 5 Days | HONEYWELL |
S283A305-2 | ANTICOLLISION FUSELAGE STROBE LI | TEST | 3 Days | HONEYWELL |
S283T001-2 | ANTISKID CONTROL VALVE | OVERHAUL | 14 Days | CRANE |
S283T001-2 | ANTISKID CONTROL VALVE | REPAIR | 5 Days | CRANE |
S283T001-2 | ANTISKID CONTROL VALVE | TEST | 3 Days | CRANE |
S293W430-6 | QUANTITY MEASURING FUSE ASSY | OVERHAUL | 14 Days | TRIUMPH ACTUATION SYSTEMS |
S293W430-6 | QUANTITY MEASURING FUSE ASSY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S293W430-6 | QUANTITY MEASURING FUSE ASSY | TEST | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S294W122-1 | FUSE ASSEMBLY | INSPECT | 3 Days | TRIUMPH ACTUATION SYSTEMS |
S294W122-1 | FUSE ASSEMBLY | REPAIR | 5 Days | TRIUMPH ACTUATION SYSTEMS |
S294W201-32 | ANTI-SKID VALVE | OVERHAUL | 14 Days | CRANE |
S294W201-32 | ANTI-SKID VALVE | REPAIR | 5 Days | CRANE |
S294W201-32 | ANTI-SKID VALVE | TEST | 3 Days | CRANE |
S315N370-1 | SHAFT LOCK SYNCHRO | OVERHAUL | 14 Days | |
S315N370-1 | SHAFT LOCK SYNCHRO | REPAIR | 5 Days | |
S315N370-1 | SHAFT LOCK SYNCHRO | TEST | 3 Days | |
S315N370-2 | SHAFT LOCK SYNCHRO | OVERHAUL | 14 Days | GOODRICH |
S315N370-2 | SHAFT LOCK SYNCHRO | REPAIR | 5 Days | GOODRICH |
S315N370-2 | SHAFT LOCK SYNCHRO | TEST | 3 Days | GOODRICH |
S315N370-3 | SHAFT LOCK SYNCHRO | OVERHAUL | 14 Days | GOODRICH |
S315N370-3 | SHAFT LOCK SYNCHRO | REPAIR | 5 Days | GOODRICH |
S315N370-3 | SHAFT LOCK SYNCHRO | TEST | 3 Days | GOODRICH |
S352W100-3 | VIBRATION ISOLATION SYSTEM | OVERHAUL | 14 Days | BARRY CONTROLS |
S352W100-3 | VIBRATION ISOLATION SYSTEM | REPAIR | 5 Days | BARRY CONTROLS |
S352W100-3 | VIBRATION ISOLATION SYSTEM | TEST | 3 Days | BARRY CONTROLS |
S352W100-4 | VIBRATION ISOLATION SYSTEM | OVERHAUL | 14 Days | BARRY CONTROLS |
S352W100-4 | VIBRATION ISOLATION SYSTEM | REPAIR | 5 Days | BARRY CONTROLS |
S352W100-4 | VIBRATION ISOLATION SYSTEM | TEST | 3 Days | BARRY CONTROLS |
S352W100-5 | VIBRATION ISOLATION SYSTEM | OVERHAUL | 14 Days | BARRY CONTROLS |
S352W100-5 | VIBRATION ISOLATION SYSTEM | REPAIR | 5 Days | BARRY CONTROLS |
S352W100-5 | VIBRATION ISOLATION SYSTEM | TEST | 3 Days | BARRY CONTROLS |
S4-3400920-02 | 2-WAY VALVE | OVERHAUL | 14 Days | LIEBHERR |
S4-3400920-02 | 2-WAY VALVE | REPAIR | 5 Days | LIEBHERR |
S4-3400920-02 | 2-WAY VALVE | TEST | 3 Days | LIEBHERR |
S4-3400920-03 | 2-WAY VALVE | OVERHAUL | 14 Days | LIEBHERR |
S4-3400920-03 | 2-WAY VALVE | REPAIR | 5 Days | LIEBHERR |
S4-3400920-03 | 2-WAY VALVE | TEST | 3 Days | LIEBHERR |
S4-3401072-01 | ELECTRO-MANUAL SELECTOR VALVE | OVERHAUL | 14 Days | LIEBHERR |
S4-3401072-01 | ELECTRO-MANUAL SELECTOR VALVE | REPAIR | 5 Days | LIEBHERR |
S4-3401072-01 | ELECTRO-MANUAL SELECTOR VALVE | TEST | 3 Days | LIEBHERR |
S4-3401310-03 | SAFETY VALVE | OVERHAUL | 14 Days | LIEBHERR |
S4-3401310-03 | SAFETY VALVE | REPAIR | 5 Days | LIEBHERR |
S4-3401310-03 | SAFETY VALVE | TEST | 3 Days | LIEBHERR |
S4-3401310-04 | SAFETY VALVE | OVERHAUL | 14 Days | LIEBHERR |
S4-3401310-04 | SAFETY VALVE | REPAIR | 5 Days | LIEBHERR |
S4-3401310-04 | SAFETY VALVE | TEST | 3 Days | LIEBHERR |
S4-3401610-01 | VALVE 3/2 WAY | OVERHAUL | 14 Days | LIEBHERR |
S4-3401610-01 | VALVE 3/2 WAY | REPAIR | 5 Days | LIEBHERR |
S4-3401610-01 | VALVE 3/2 WAY | TEST | 3 Days | LIEBHERR |
SB209L1A1-1480 | ACCUMULATOR | TEST | 3 Days | HYDAC |
SB209L1A1-1480 | ACCUMULATOR | REPAIR | 5 Days | HYDAC |
SB209L1A1-1480 | ACCUMULATOR | OVERHAUL | 14 Days | HYDAC |
SB209L1A1-1481 | ACCUMULATOR | TEST | 3 Days | HYDAC |
SB209L1A1-1481 | ACCUMULATOR | REPAIR | 5 Days | HYDAC |
SB209L1A1-1481 | ACCUMULATOR | OVERHAUL | 14 Days | HYDAC |
SB209L1A1-1483 | ACCUMULATOR HYDRAULIC | TEST | 3 Days | HYDAC |
SB209L1A1-1483 | ACCUMULATOR HYDRAULIC | REPAIR | 5 Days | HYDAC |
SB209L1A1-1483 | ACCUMULATOR HYDRAULIC | OVERHAUL | 14 Days | HYDAC |
SB209L1A1-1484 | ACCUMULATOR | TEST | 3 Days | HYDAC |
SB209L1A1-1484 | ACCUMULATOR | REPAIR | 5 Days | HYDAC |
SB209L1A1-1484 | ACCUMULATOR | OVERHAUL | 14 Days | HYDAC |
TC125UK00ZY1 | INDICATOR HYDR DIFF PRESSURE | INSPECT | 3 Days | BOEING |
TC125UK06Y | INDICATOR-DIFF PRESSURE HYDR | INSPECT | 3 Days | BOEING |
TY1540-23 | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-23 | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-23 | HYDRAULIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1540-24 | HYDRUALIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-24 | HYDRUALIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-24 | HYDRUALIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1540-24A | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-24A | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-24A | HYDRAULIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1540-24B | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-24B | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-24B | HYDRAULIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1540-24C | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-24C | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-24C | HYDRAULIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1540-24D | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-24D | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-24D | HYDRAULIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1540-24E | HYDRAULIC CONTROL UNIT | OVERHAUL | 14 Days | GOODRICH |
TY1540-24E | HYDRAULIC CONTROL UNIT | REPAIR | 5 Days | GOODRICH |
TY1540-24E | HYDRAULIC CONTROL UNIT | TEST | 3 Days | GOODRICH |
TY1878-20 | SYNCHRO-SHAFT LOCK | OVERHAUL | 14 Days | |
TY1878-20 | SYNCHRO-SHAFT LOCK | REPAIR | 5 Days | |
TY1878-20 | SYNCHRO-SHAFT LOCK | TEST | 3 Days | |
TY1878-20B | SYNCHRO SHAFT LOCK | OVERHAUL | 14 Days | |
TY1878-20B | SYNCHRO SHAFT LOCK | REPAIR | 5 Days | |
TY1878-20B | SYNCHRO SHAFT LOCK | TEST | 3 Days | |
TY1878-21 | SYNCHRO-SHAFT LOCK | OVERHAUL | 14 Days | |
TY1878-21 | SYNCHRO-SHAFT LOCK | REPAIR | 5 Days | |
TY1878-21 | SYNCHRO-SHAFT LOCK | TEST | 3 Days | |
TY1878-21B | SYNCHRO-SHAFT LOCK | OVERHAUL | 14 Days | |
TY1878-21B | SYNCHRO-SHAFT LOCK | REPAIR | 5 Days | |
TY1878-21B | SYNCHRO-SHAFT LOCK | TEST | 3 Days | |
TY1878-21C | SYNCHRO-SHAFT LOCK | OVERHAUL | 14 Days | |
TY1878-21C | SYNCHRO-SHAFT LOCK | REPAIR | 5 Days | |
TY1878-21C | SYNCHRO-SHAFT LOCK | TEST | 3 Days | |
TY1878-22 | SYNCHRO-SHAFT LOCK | OVERHAUL | 14 Days | |
TY1878-22 | SYNCHRO-SHAFT LOCK | REPAIR | 5 Days | |
TY1878-22 | SYNCHRO-SHAFT LOCK | TEST | 3 Days | |
U91A | ROTARY VARIABLE DIFFERENTIAL TR | INSPECT | 3 Days | MPC PRODUCTS |
U91B | ROTARY VARIABLE DIFFERENTIAL TR | INSPECT | 3 Days | MPC PRODUCTS |
V2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
V2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
V2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
V2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
V2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
V2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
V6-4360-1 | FUSE | OVERHAUL | 14 Days | |
V6-4360-1 | FUSE | REPAIR | 5 Days | |
V6-4360-1 | FUSE | TEST | 3 Days | |
V6-4360-2 | FUSE | OVERHAUL | 14 Days | |
V6-4360-2 | FUSE | REPAIR | 5 Days | |
V6-4360-2 | FUSE | TEST | 3 Days | |
V6-4360 | FUSE | OVERHAUL | 14 Days | |
V6-4360 | FUSE | REPAIR | 5 Days | |
V6-4360 | FUSE | TEST | 3 Days | |
VT0107F | PRESSURE TRANSDUCER | INSPECT | 3 Days | BOEING |
W2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
W2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
W2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
W2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
W2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
W2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
X2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
X2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
X2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
X2350-0082 | MOTOR ACTUATOR | OVERHAUL | 14 Days | CIRCOR |
X2350-0082 | MOTOR ACTUATOR | REPAIR | 5 Days | CIRCOR |
X2350-0082 | MOTOR ACTUATOR | TEST | 3 Days | CIRCOR |
Y2350-0075 | MOTOR ACTUATOR | OVERHAUL | 14 Days | |
Y2350-0075 | MOTOR ACTUATOR | REPAIR | 5 Days | |
Y2350-0075 | MOTOR ACTUATOR | TEST | 3 Days | |
Y2350-0082 | ACTUATOR MOTOR | OVERHAUL | 14 Days | |
Y2350-0082 | ACTUATOR MOTOR | REPAIR | 5 Days | |
Y2350-0082 | ACTUATOR MOTOR | TEST | 3 Days | |
ZAW382-00 | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
ZAW382-01 | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
ZRA1990030 | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
ZRA380-00 | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
ZRA691-00 | PRESSURE TRANSDUCER | INSPECT | 3 Days | ESTERLINE |
Part Number | Description | Type | Delivery | Manufacturer |
© LiftMRO. All Rights Reserved. Designed by MM Systems Solutions